共 50 条
- [21] Translating output specifications to production flow requirements for re-entrant lines PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 2160 - 2165
- [24] Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 211 - 216
- [26] Simulation based sensitivity analysis of re-entrant queueing networks Kongzhi yu Juece/Control and Decision, 2001, 16 (01): : 37 - 41
- [27] Research on Re-entrant System Scheduling Problem Based on Petri Net and Ant Colony Algorithm 2014 33RD CHINESE CONTROL CONFERENCE (CCC), 2014, : 7561 - 7566
- [29] Identification of Superior Improvement Trajectories for Production Lines via Simulation-Based Optimization with Reinforcement Learning ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 405 - 413
- [30] Heuristic based genetic algorithms for the re-entrant total completion time flowshop scheduling with learning consideration International Journal of Computational Intelligence Systems, 2016, 9 : 1082 - 1100