共 50 条
- [41] Time Interleaved ADCs Requirements vs. Application 2018 IEEE CUSTOM INTEGRATED CIRCUITS CONFERENCE (CICC), 2018,
- [44] Technical feasibility vs. clinical utility: a question of “can we?” vs. “should we?” European Journal of Nuclear Medicine and Molecular Imaging, 2012, 39 : 260 - 261
- [46] An owner/operator's perspective on the EPC project handover HYDROCARBON PROCESSING, 2009, 88 (04): : 7 - 7
- [47] ENHANCEMENT OF OWNER'S RETURN THROUGH PROJECT FINANCE AKTUALNE PROBLEMY PODNIKOVEJ SFERY 2012, 2012, : 271 - 276
- [49] An integrated approach to project quality: The owner's perspective ASQ'S 54TH ANNUAL QUALITY CONGRESS PROCEEDINGS, 2000, : 365 - 370
- [50] TO PROJECT VS. TO FIGURE. ASPECTS OF PROJECTIVE GEOMETRY IN THE WITTGENSTEIN'S TRACTATUS REVISTA COLOMBIANA DE FILOSOFIA DE LA CIENCIA, 2013, 13 (26): : 47 - 60