Study on Scheduling Optimization for Flexible Job Shop

被引:2
|
作者
Liu, Xiaoxia [1 ]
Liu, Chunbo [1 ]
Tao, Ze [2 ]
机构
[1] Henan Univ Technol, Zhengzhou 450007, Peoples R China
[2] Shenyang Ligong Univ, Shenyang 110168, Peoples R China
关键词
multi-objective optimization; Pareto optimum; genetic algorithm; flexible job shop scheduling;
D O I
10.4028/www.scientific.net/AMM.26-28.821
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A hybrid genetic algorithm based on Pareto was proposed and applied to flexible job shop scheduling problem (FJSP) with multi-objective, and the multi-objective FJSP optimization model was built, where the make-span and the machine utilization rate were concerned. The algorithm embeds Pareto ranking strategy into Pareto competition method. The operation-based encoding and an active scheduling decoding method are employed. In order to promote solution diversity, the niche technology and many kinds of crossover operations are used. Pareto filter saves the optimum individual occurring in the course of evolution, which avoids losing the optimum solutions. Three simulation experiments are carried out to illustrate that the proposed method could solve multi-objective job shop scheduling problem effectively.
引用
收藏
页码:821 / +
页数:2
相关论文
共 50 条
  • [31] Scheduling of a Flexible Job Shop with Multiple Constraints
    Aschauer, A.
    Roetzer, F.
    Steinboeck, A.
    Kugi, A.
    IFAC PAPERSONLINE, 2018, 51 (11): : 1293 - 1298
  • [32] A Genetic Algorithm for Flexible Job Shop Scheduling
    Chaudhry, Imran A.
    Khan, Abdul Munem
    Khan, Abid Ali
    WORLD CONGRESS ON ENGINEERING - WCE 2013, VOL I, 2013, : 703 - 708
  • [33] JOB SHOP SCHEDULING WITH FLEXIBLE ENERGY PRICES
    Selmair, Maximilian
    Claus, Thorsten
    Trost, Marco
    Bley, Andreas
    Hellmann, Frank
    PROCEEDINGS - 30TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2016, 2016, : 488 - 494
  • [34] An improved algorithm for flexible job shop scheduling
    Han Jin-dong
    Zhang Ying-hong
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHATRONICS, CONTROL AND ELECTRONIC ENGINEERING, 2014, 113 : 750 - 754
  • [35] The flexible job shop scheduling problem: A review
    Dauzere-Peres, Stephane
    Ding, Junwen
    Shen, Liji
    Tamssaouet, Karim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 314 (02) : 409 - 432
  • [36] Hybrid frameworks for flexible job shop scheduling
    Puja Bharti
    Sushma Jain
    The International Journal of Advanced Manufacturing Technology, 2020, 108 : 1563 - 1585
  • [37] An Improved Harris Hawk Optimization Algorithm for Flexible Job Shop Scheduling Problem
    Lv, Zhaolin
    Zhao, Yuexia
    Kang, Hongyue
    Gao, Zhenyu
    Qin, Yuhang
    CMC-COMPUTERS MATERIALS & CONTINUA, 2024, 78 (02): : 2337 - 2360
  • [38] Flexible Job Shop Scheduling Problem Using an Improved Ant Colony Optimization
    Wang, Lei
    Cai, Jingcao
    Li, Ming
    Liu, Zhihu
    SCIENTIFIC PROGRAMMING, 2017, 2017
  • [39] Aggregative approach for the multiobjective optimization flexible job-shop scheduling problems
    Saad, Ihsen
    Hammadi, Slim
    Borne, Pierre
    Benrejeb, Mohamed
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 889 - 894
  • [40] Energy-efficient Optimization of Flexible Job Shop Scheduling and Preventive Maintenance
    Mirahmadi, Nasim
    Taghipour, Sharareh
    2019 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS 2019) - R & M IN THE SECOND MACHINE AGE - THE CHALLENGE OF CYBER PHYSICAL SYSTEMS, 2019,