Scheduling of a Flexible Job Shop with Multiple Constraints

被引:3
|
作者
Aschauer, A. [1 ]
Roetzer, F. [1 ]
Steinboeck, A. [1 ]
Kugi, A. [1 ]
机构
[1] TU Wien, Automat & Control Inst, Gusshausstr 27-29, A-1040 Vienna, Austria
来源
IFAC PAPERSONLINE | 2018年 / 51卷 / 11期
关键词
scheduling; timetabling; flexible job shop; no-wait constraints; shift work; configuration change; release dates; due dates; product orders; WAIT IN-PROCESS; BLOCKING;
D O I
10.1016/j.ifacol.2018.08.354
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The increasing demand for flexible production systems can be partially met by advanced scheduling techniques to allocate processing steps of products to machines and to define processing times. Mass production becomes sparse and special constraints like release and due dates, configuration changes, restrictions for products of the same order, or shift work are new challenges for the scheduling process. This paper deals with the scheduling in a hot rolling mill which can be modeled as a flexible job shop with no-wait constraints and the objective to minimize the makespan. Existing solutions for this type of problem are extended in this paper to incorporate multiple complex constraints. A distinction between hard and soft constraints helps to keep the multi-constraint scheduling task manageable. (C) 2018, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1293 / 1298
页数:6
相关论文
共 50 条
  • [1] An improved genetic algorithm for the flexible job shop scheduling problem with multiple time constraints
    Zhang, Guohui
    Hu, Yifan
    Sun, Jinghe
    Zhang, Wenqiang
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2020, 54
  • [2] Flexible job-shop scheduling problems with 'AND'/'OR' precedence constraints
    Lee, Sanghyup
    Moon, Ilkyeong
    Bae, Hyerim
    Kim, Jion
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (07) : 1979 - 2001
  • [3] Flexible job-shop scheduling problem with resource recovery constraints
    Vallikavungal Devassia, Jobish
    Angelica Salazar-Aguilar, M.
    Boyer, Vincent
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3326 - 3343
  • [4] A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
    Rajkumar, M.
    Asokan, P.
    Vamsikrishna, V.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (22) : 6821 - 6836
  • [5] A Mathematical Model for the Flexible Job Shop Scheduling Problem With Availability Constraints
    Perroux, Tom
    Arbaoui, Taha
    Merghem-Boulahia, Leila
    [J]. IFAC PAPERSONLINE, 2023, 56 (02): : 5388 - 5393
  • [6] Flexible job-shop scheduling problem under resource constraints
    Chan, F. T. S.
    Wong, T. C.
    Chan, L. Y.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (11) : 2071 - 2089
  • [7] An effective algorithm for flexible assembly job-shop scheduling with tight job constraints
    Lin, Wenhui
    Deng, Qianwang
    Han, Wenwu
    Gong, Guiliang
    Li, Kexin
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2022, 29 (01) : 496 - 525
  • [8] An improved ant colony optimization for solving the flexible job shop scheduling problem with multiple time constraints
    Yan, Shaofeng
    Zhang, Guohui
    Sun, Jinghe
    Zhang, Wenqiang
    [J]. MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2023, 20 (04) : 7519 - 7547
  • [9] Review on flexible job shop scheduling
    Xie, Jin
    Gao, Liang
    Peng, Kunkun
    Li, Xinyu
    Li, Haoran
    [J]. IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2019, 1 (03) : 67 - 77
  • [10] Flexible job shop scheduling with blockages
    Hansmann, R. S.
    Rieger, T.
    Zimmermann, U. T.
    [J]. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2014, 79 (02) : 135 - 161