Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge

被引:2
|
作者
Wu, Zhenhong [1 ]
Xun, Yong [1 ,2 ]
Gan, Yanan [2 ]
Wang, Chunhua [3 ]
Li, Ying [4 ]
Tang, Shichen [1 ]
机构
[1] Jiangsu Univ, Sch Automobile & Traff Engn, Zhenjiang 212013, Peoples R China
[2] Yancheng Inst Technol, Yancheng 224552, Peoples R China
[3] Jiangsu Provingial Transportat Engn Grp CO LTD, Zhenjiang 212013, Peoples R China
[4] Jiangsu Jiaotong Coll, Zhenjiang 212013, Peoples R China
关键词
Locking steel pipe pile; Deep pile; Cofferdam design; Construction;
D O I
10.4028/www.scientific.net/AMM.226-228.1531
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
South tower of Taizhou bridge is located in complex hydrogeological conditions,the amount of its excavation engineering is large.Combined with the successful application of locking steel pipe pile cofferdam in the south tower project of Taizhou Yangtze Highway Bridge,from comparison and demonstration, scheme design and construction, process monitoring to introduce locking steel pipe pile cofferdam in detail,using the classical method and the M method to design and calculation for supporting structure.Construction practice shows that the design and calculation of support structure is accurate,locking steel pipe pile fully played its function of sealing,it also has great rigidity, good integrity strong bending resistance and other advantages.The successfully application of this technology,promoting the technological progress of bridge foundation constructionthe in deep water or complex geological conditions,it provides a basis for the construction of similar projects in the future.
引用
收藏
页码:1531 / +
页数:2
相关论文
共 50 条
  • [41] Design and construction of H-steel and reinforced concrete composite pile
    Lin, Ruizhao
    Li, Yongqian
    He Jishu/Nuclear Techniques, 1997, 20 (06): : 8 - 11
  • [42] Current Design and Construction Practices of Bridge Pile Foundations with Emphasis on Implementation of LRFD
    AbdelSalam, Sherif S.
    Sritharan, Sri
    Suleiman, Muhannad T.
    JOURNAL OF BRIDGE ENGINEERING, 2010, 15 (06) : 749 - 758
  • [43] Cofferdam design considerations for the construction of river bridge piers
    Ivarson, WR
    13TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, OFFICIAL PROCEEDINGS, 1996, : 405 - 410
  • [44] Construction Techniques of Pile Cap for Maintenance and Reinforcement for Pier Foundation in Water of Old Bridge of Cultural Relics
    Cheng, Yi-Biao
    Du, En-Bo
    Bridge Construction, 2019, 49 (03) : 102 - 107
  • [45] Bridge bored pile construction management and accident treatment
    Zhang, Yonghong
    Tang, Lijun
    Wang, Ning
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 1535 - +
  • [46] Software Development of Parameterization Design for Cap of Pile Foundation
    Yuan, Ling
    Wang, Wei
    Huang, Bo
    2016 12TH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY (ICNC-FSKD), 2016, : 2221 - 2225
  • [47] Analysis of the pile-to-cap connection of pile caps on two steel piles - An experimental and numerical study
    Goncalves, Vitor Freitas
    Delalibera, Rodrigo Gustavo
    de Oliveira Filho, Marcio Alves
    ENGINEERING STRUCTURES, 2022, 252
  • [48] RECOMMENDATIONS FOR STRUCTURAL DESIGN OF PILE CAP FOR SINGLE PILE WITH HORIZONTAL TWO-WAY ECCENTRICITY
    Suzuki S.
    Kugai K.
    Ichinose T.
    Journal of Structural and Construction Engineering, 2024, 89 (821): : 763 - 770
  • [49] THICK PLATE ANALYSIS WITH APPLICATION TO PILE CAP DESIGN
    Cheng Y MZhang Y HDepartment of Civil and Structural EngineeringThe Hong Kong Polytechnic UniversityHong KongChinaInstitute of Rock and Soil MechanicsThe Chinese Academy of SciencessWuhan China
    岩石力学与工程学报, 2004, (06) : 1001 - 1006
  • [50] Study on end bearing capacity of cement milk pile construction method for steel pile
    Nihon Univ. Junior College, Japan
    不详
    AIJ J. Technol. Des., 51 (471-476 and 834):