Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge

被引:2
|
作者
Wu, Zhenhong [1 ]
Xun, Yong [1 ,2 ]
Gan, Yanan [2 ]
Wang, Chunhua [3 ]
Li, Ying [4 ]
Tang, Shichen [1 ]
机构
[1] Jiangsu Univ, Sch Automobile & Traff Engn, Zhenjiang 212013, Peoples R China
[2] Yancheng Inst Technol, Yancheng 224552, Peoples R China
[3] Jiangsu Provingial Transportat Engn Grp CO LTD, Zhenjiang 212013, Peoples R China
[4] Jiangsu Jiaotong Coll, Zhenjiang 212013, Peoples R China
关键词
Locking steel pipe pile; Deep pile; Cofferdam design; Construction;
D O I
10.4028/www.scientific.net/AMM.226-228.1531
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
South tower of Taizhou bridge is located in complex hydrogeological conditions,the amount of its excavation engineering is large.Combined with the successful application of locking steel pipe pile cofferdam in the south tower project of Taizhou Yangtze Highway Bridge,from comparison and demonstration, scheme design and construction, process monitoring to introduce locking steel pipe pile cofferdam in detail,using the classical method and the M method to design and calculation for supporting structure.Construction practice shows that the design and calculation of support structure is accurate,locking steel pipe pile fully played its function of sealing,it also has great rigidity, good integrity strong bending resistance and other advantages.The successfully application of this technology,promoting the technological progress of bridge foundation constructionthe in deep water or complex geological conditions,it provides a basis for the construction of similar projects in the future.
引用
收藏
页码:1531 / +
页数:2
相关论文
共 50 条
  • [31] Construction proposals and construction technology of steel plate pile cofferdam of off-shore pumping house for the highest foundation in Asia
    Pang, Qibiao
    Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2000, 22 (04): : 108 - 112
  • [32] Comparison of Moments for Pile-Cap Design
    Magade, S. B.
    Ingle, R. K.
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2020, 56 (06) : 414 - 419
  • [33] Comparison of Moments for Pile-Cap Design
    S. B. Magade
    R. K. Ingle
    Soil Mechanics and Foundation Engineering, 2020, 56 : 414 - 419
  • [34] Research on Effective Embedded Depth of Bottomless Steel Sheet Pile Cofferdam in Rock
    Huang Y.
    Fei Z.
    Kang A.
    Zhang D.
    Jin K.
    Bridge Construction, 2023, 53 (06) : 103 - 110
  • [35] Numerical Analysis of Precast Pile Cap for Accelerated Construction
    Wang, Jinfeng
    Xu, Qianqian
    Xiang, Huawei
    Wang, Yutong
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (12)
  • [37] Study of the monitoring system for double row steel sheet pile cofferdam engineering
    Wang J.
    Liu G.
    International Journal of Wireless and Mobile Computing, 2022, 23 (3-4) : 256 - 260
  • [38] Behavior, Performance, and Evaluation of Prestressed Concrete/Steel Pipe/Steel H-Pile to Pile Cap Connections
    Arockiasamy, Madasamy
    Arvan, Prakash Ankitha
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2022, 27 (02)
  • [39] Analysis of pile cap behavior in connection with steel piles
    Burgos Filho, Ronaldo
    Zarzar Junior, Fuad Carlos
    de Oliveira, Romilde Almeida
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 268 - 268
  • [40] Analysis of Dynamic Stiffness of Bridge Cap-Pile System
    Chu, Jinhui
    Ma, Meng
    Liu, Jinbo
    SHOCK AND VIBRATION, 2018, 2018