Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge

被引:2
|
作者
Wu, Zhenhong [1 ]
Xun, Yong [1 ,2 ]
Gan, Yanan [2 ]
Wang, Chunhua [3 ]
Li, Ying [4 ]
Tang, Shichen [1 ]
机构
[1] Jiangsu Univ, Sch Automobile & Traff Engn, Zhenjiang 212013, Peoples R China
[2] Yancheng Inst Technol, Yancheng 224552, Peoples R China
[3] Jiangsu Provingial Transportat Engn Grp CO LTD, Zhenjiang 212013, Peoples R China
[4] Jiangsu Jiaotong Coll, Zhenjiang 212013, Peoples R China
关键词
Locking steel pipe pile; Deep pile; Cofferdam design; Construction;
D O I
10.4028/www.scientific.net/AMM.226-228.1531
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
South tower of Taizhou bridge is located in complex hydrogeological conditions,the amount of its excavation engineering is large.Combined with the successful application of locking steel pipe pile cofferdam in the south tower project of Taizhou Yangtze Highway Bridge,from comparison and demonstration, scheme design and construction, process monitoring to introduce locking steel pipe pile cofferdam in detail,using the classical method and the M method to design and calculation for supporting structure.Construction practice shows that the design and calculation of support structure is accurate,locking steel pipe pile fully played its function of sealing,it also has great rigidity, good integrity strong bending resistance and other advantages.The successfully application of this technology,promoting the technological progress of bridge foundation constructionthe in deep water or complex geological conditions,it provides a basis for the construction of similar projects in the future.
引用
收藏
页码:1531 / +
页数:2
相关论文
共 50 条
  • [1] Steel Cofferdam Design and Calculation for High Pile Cap Construction
    Xia Gui-yun
    Yang Mei-liang
    Li Chuan-xi
    Lu Shang-wu
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1879 - +
  • [2] Key technology for construction of connection between steel pylonand concrete pile cap of middle pylon of Taizhou Bridge
    Sun Yuxiang1
    2. China Communications 2nd Navigational Bureau Co. Ltd.
    3. Key Laboratory in Communications Industry for Construction Technologies of Long and Large Bridges
    EngineeringSciences, 2012, 10 (03) : 8 - 11
  • [3] Case Study on Design and Construction of Cofferdam with Tie Back for Pile Cap Construction on a River Embankment
    Kalidoss, Rajarajan
    Ravi, Sowmiyaa
    Nagarajan, D.
    Vijayakumar, T.
    IFCEE 2024: DRILLED AND DRIVEN FOUNDATIONS AND INNOVATIVE AND EMERGING APPROACHES FOR FOUNDATION ENGINEERING, 2024, 354 : 225 - 236
  • [4] Mechanical Characteristics of Concrete Bottom Slab in Elevated Pile Cap Steel Boxed Cofferdam in a Bridge
    Wang, Wenjing
    Liang, Bin
    Chen, Weiwei
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND TRANSPORTATION 2015, 2016, 30 : 154 - 157
  • [5] Design and construction of the cofferdam pile with GFRP reinforced concrete
    Ma Minglei
    Wang Guiling
    Miao Dongmei
    Lian Baoyu
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 437 - 440
  • [6] Analysis of a steel sheet pile cofferdam by converse construction method
    Zhang, Hongbin
    An, Guanfeng
    Liu, Tianjun
    Zhang, Guoxiang
    Electronic Journal of Geotechnical Engineering, 2014, 19 (0Z): : 9145 - 9158
  • [7] Method for earth pressure in design of steel sheet pile cofferdam
    Tang, Jin-Song
    Xiong, Bao-Lin
    Tang, Jin-Song, 1600, Chinese Society of Civil Engineering (36): : 36 - 41
  • [8] Construction of Prefabricated Concrete Cofferdam for Casting of Very Large Pile Cap and Computation Analysis
    Li W.-J.
    Li Z.
    Bridge Construction, 2023, 53 (01) : 136 - 142
  • [9] Permanent tubular steel pile cofferdam foundations
    Terada, K.
    Saito, D.
    Structural Engineer, 2013, 91 (04): : 50 - 58
  • [10] Strengthening of Interlocking Steel Pipe Pile Cofferdam Used in Main Pier Foundation Construction of Guanzhanhe River Bridge in Chongqing
    Qian J.
    Jia R.
    Song S.
    Yang J.
    Bridge Construction, 2024, 54 (01) : 148 - 154