A multi-stage production-inventory model with learning and forgetting effects, rework and scrap

被引:62
|
作者
Glock, Christoph H. [1 ]
Jaber, Mohamad Y. [2 ]
机构
[1] Tech Univ Darmstadt, Carlo & Karin Giersch Endowed Chair Business Mana, Hsch Str 1, D-64289 Darmstadt, Germany
[2] Ryerson Univ, Dept Mech & Ind Engn, Toronto, ON M5B 2K3, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Multistage production; Learning; Forgetting; Imperfect quality; Lot splitting; Performance measures; ECONOMIC PRODUCTION QUANTITY; QUALITY IMPROVEMENT; LOT; SYSTEMS; CURVES;
D O I
10.1016/j.cie.2012.08.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies a serial production line where a proportion of defective items is produced at each stage. Defective units enter a rework process, which is imperfect as well. Twice defective items are scrapped. This paper also considers learning and forgetting in production and rework processes and studies how the number of shipments of a lot from a production stage to the next influences the overall performance of the system. A model for a multi-stage production-inventory system is developed and optimized against an aggregate performance measure of four partial measures that are based on production time, process yield, in-process inventory and shipment frequency. Each of these partial performance measures is weighed by the system's decision maker in accordance to importance. The numerical results show how the values of learning rates, weights assigned to the partial performance measures and the number of production stages influence the overall performance of the system. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:708 / 720
页数:13
相关论文
共 50 条
  • [41] Integer models in the stochastic systems of multi-stage production/inventory system
    Niu, Hai-Jun
    Sun, Shu-Dong
    Xi'an Dianzi Keji Daxue Xuebao/Journal of Xidian University, 2001, 28 (05): : 612 - 615
  • [42] Analysis of multi-stage production/inventory system with an acceptable response time
    Takeda, K
    Kuroda, M
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 725 - 728
  • [43] PRODUCTION AND INVENTORY DECISIONS IN A MULTI-STAGE SUPPLY CHAIN WITH TRANSPORTATION COST
    Seliaman, M. E.
    Ahmad, Ab Rahman
    Saif, Abdul-Wahid A.
    2008 3RD INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES: FROM THEORY TO APPLICATIONS, VOLS 1-5, 2008, : 484 - +
  • [44] An EPQ model for an imperfect production system with rework, scrap and backorder
    Biswas, Pablo
    Schultz, Scott R.
    International Journal of Industrial and Systems Engineering, 2021, 37 (04) : 411 - 431
  • [45] A capacitated production-inventory model with periodic demand
    Kapuscinski, R
    Tayur, S
    OPERATIONS RESEARCH, 1998, 46 (06) : 899 - 911
  • [46] Optimal Control Model of Production-Inventory System
    Prazak, Pavel
    MATHEMATICAL METHODS IN ECONOMICS (MME 2014), 2014, : 825 - 830
  • [47] A composite model in the context of a production-inventory system
    Sharma, Sanjay
    OPTIMIZATION LETTERS, 2009, 3 (02) : 239 - 251
  • [48] AN INTEGRATED PRODUCTION-INVENTORY MODEL WITH REPROCESSING AND INSPECTION
    TAYI, GK
    BALLOU, DP
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (08) : 1299 - 1315
  • [49] A production-inventory model of HMMS on time scales
    Atici, Ferhan M.
    Uysal, Fahriye
    APPLIED MATHEMATICS LETTERS, 2008, 21 (03) : 236 - 243
  • [50] A composite model in the context of a production-inventory system
    Sanjay Sharma
    Optimization Letters, 2009, 3 : 239 - 251