An EPQ model for an imperfect production system with rework, scrap and backorder

被引:0
|
作者
Biswas, Pablo [1 ]
Schultz, Scott R. [2 ]
机构
[1] Department of Industrial Engineering and Industrial Management, Mercer University, Macon,GA, United States
[2] Department of Industrial Engineering and Industrial Management, School of Engineering, Mercer University, Macon,GA, United States
关键词
Economic production quantity - Imperfect production systems - Inventory modeling - Manufacturing process - Material orderings - Optimal order quantity - Total cost function - Two-stage production;
D O I
暂无
中图分类号
学科分类号
摘要
This paper deals with an imperfect two-stage manufacturing process that orders raw materials from a supplier and produces finished goods with defective items that can be reworked. The generation of scrap during the initial production stage, during inspection, and during the rework stage is also considered. To fulfil customer demand a permissible backorder is also considered. First, an inventory model is developed for this two-stage production process with instantaneous raw material order, in-cycle rework, and scrap. Then, a total cost function is developed to simultaneously find the optimal economic production quantity, optimal backorder quantity, and optimal order quantity. The cost function of the proposed inventory model is verified and validated using numerical examples and sensitivity analysis. © 2021 Inderscience Enterprises Ltd.. All rights reserved.
引用
收藏
页码:411 / 431
相关论文
共 50 条
  • [1] Algebraic methods for optimizing EPQ model with rework and scrap
    Chiu, Yuan-Shyi Peter
    Cheng, Feng-Tsung
    Ting, Chia-Kuan
    WSEAS Transactions on Systems, 2007, 6 (11): : 1319 - 1323
  • [2] A surface response optimization model for EPQ system with imperfect production process under rework and shortage
    Abdel-Aleem A.
    El-Sharief M.A.
    Hassan M.A.
    El-Sebaie M.G.
    OPSEARCH, 2017, 54 (4) : 735 - 751
  • [3] An EPQ Model for Deteriorating Production System and Items with Rework
    Li, N.
    Chan, Felix T. S.
    Chung, S. H.
    Tai, Allen H.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [4] An EPQ model with inflation in an imperfect production system
    Sarkar, Biswajit
    Moon, Ilkyeong
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (13) : 6159 - 6167
  • [5] An EPQ model for imperfect production systems with rework and incorporating a multi-delivery policy
    Krishnamoorthi, C.
    Panayappan, S.
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2013, 8 (02) : 142 - 152
  • [6] Outsourcing Rework of Imperfect Items in the Economic Production Quantity (EPQ) Inventory Model With Backordered Demand
    Taleizadeh, Ata Allah
    Sari-Khanbaglo, Mahboobeh Perak
    Eduardo Cardenas-Barron, Leopoldo
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2019, 49 (12): : 2688 - 2699
  • [7] Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note
    Chiu, Yuan-Shyi Peter
    Chang, Huei-Hsin
    ECONOMIC MODELLING, 2014, 37 : 143 - 148
  • [8] Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    Chiu, Singa Wang
    Wang, Shan-Ling
    Chiu, Yuan-Shyi Peter
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) : 664 - 676
  • [9] A mathematical model on EPQ for stochastic demand in an imperfect production system
    Pal, Brojeswar
    Sana, Shib Sankar
    Chaudhuri, Kripasindhu
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 260 - 270
  • [10] A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
    Chiu, Yuan-Shyi Peter
    Ting, Chia-Kuan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (02) : 641 - 643