Risk-Based Path Planning for a Steerable Flexible Probe for Neurosurgical Intervention

被引:0
|
作者
Caborni, Chiara [1 ]
Ko, Seong Young [2 ,3 ]
De Momi, Elena [1 ]
Ferrigno, Giancarlo [1 ]
Rodriguez y Baena, Ferdinando [2 ]
机构
[1] Politecn Milan, Dept Biomed Engn, I-20133 Milan, Italy
[2] Imperial Coll London, Dept Mech Engn, London SW7 2AZ, England
[3] Chonnam Natl Univ, Sch Mech Syst Engn, Kwangju 500757, South Korea
基金
英国工程与自然科学研究理事会;
关键词
Path Planning; Non-holonomic Systems; Medical Robotics; Flexible Probe; Rapidly-exploring Random Trees; Curvature Constraint; Brain Risk Map;
D O I
暂无
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
Minimally invasive surgery has become increasingly common in neurosurgical intervention. Recently, various types of flexible needles have been developed to reach deep targets while avoiding important anatomical regions. In a planning stage, it is required to compute a curvilinear trajectory from an entry point on the skull of the patient to the target lesion. We present a path planner that provides a feasible path for a steerable flexible probe which takes into account its mechanical properties and soft tissue morphology surrounding the target to produce a "path of least risk" for the patient. To meet such requirements, a well known Rapidly-exploring Random Trees (RRT)-based method is adopted since it is capable of producing a curvature-constrained path in complex brain risk maps. To alleviate the sub-optimality of RRTs, a multiple growth of trees that ensures several solutions is introduced so that the clinician can evaluate and select a path that minimizes the cost of different weighted competing objectives, such as the length of the path, the clearance from vessels or nervous bundles and, most importantly, the accumulated risk in crossing different brain regions. Simulations using the risk map of a brain's coronal slice and experimental tests using the path planner integrated with the flexible probe, showed that the approach is promising and that the main objectives of the planning method have been achieved.
引用
收藏
页码:866 / 871
页数:6
相关论文
共 50 条
  • [31] RISK-BASED MAINTENANCE PLANNING FOR FLOOD PROTECTION WALLS
    Marengwa, Jeff
    Retief, Johan
    COASTAL ENGINEERING 2008, VOLS 1-5, 2009, : 4315 - +
  • [32] Risk-Based Maintenance Planning for Rail Fastening Systems
    Kaewunruen, Sakdirat
    Osman, Mohd Haniff
    Eric, Wong Hao Cheng
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2019, 5 (03):
  • [33] Risk-based forecasting and planning and management earnings forecasts
    Christopher D. Ittner
    Jeremy Michels
    Review of Accounting Studies, 2017, 22 : 1005 - 1047
  • [34] Risk-based stabilization planning for soil cut slopes
    Li, D.
    Zhang, L.
    Zhou, C.
    Lu, W.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2009, 9 (04) : 1365 - 1379
  • [35] Risk-based remediation planning tools for refrigerants in groundwater
    Vilardi, C
    RISK, REGULATORY, AND MONITORING CONSIDERATIONS: REMEDIATION OF CHLORINATED AND RECALCITRANT COMPOUNDS, 2000, : 199 - 205
  • [36] A METHODOLOGY FOR RISK-BASED EVALUATION OF EMERGENCY RESPONSE PLANNING
    TOUCHTON, RA
    POTTER, TE
    SAUTER, GD
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 50 (NOV): : 362 - 363
  • [37] System effects in generic risk-based inspection planning
    Straub, D
    Faber, MH
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2004, 126 (03): : 265 - 271
  • [38] Risk-based Contingency Analysis for Transmission and Substation Planning
    Song, Sung-Hwan
    Lee, Sang-Ho
    Oh, Tae-Kyoo
    Lee, Jinsu
    T& D ASIA: 2009 TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: ASIA AND PACIFIC, 2009, : 573 - +
  • [39] Risk-Based Integration of Strategic and Tactical Capacity Planning
    Sunder Kekre
    Uday Rao
    Samarth Sarthi
    Jinxin Yi
    Annals of Operations Research, 2004, 132 : 85 - 108
  • [40] The Importance of Risk-Based Thinking for Enterprise Performance Planning
    Budaj, Pavol
    Hrnciar, Miroslav
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE: LIBEREC ECONOMIC FORUM 2015, 2015, : 244 - 252