Process Analysis of Construction Quality Management System for Water Project Based on Dissipative Structure Theory

被引:2
|
作者
Cao, Fujun [1 ]
Xu, Haocheng [2 ]
Jiao, Yantao [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Port Coast & Offshore Engn, Nanjing 210098, Peoples R China
关键词
dissipative structure theory; water project; construction quality management system; process analysis; collaborative management;
D O I
10.4028/www.scientific.net/AMR.655-657.2230
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Using the dissipative structure theory (DST), the construction quality management system process of water project in China (WPCQMS) is analyzed in this paper. In the history of development, the process of the participants of WPCQMS gradually undertake quality management responsibility can be divided into the following several major stages: quality self-control stage of construction unit, quality collaborative control stage of owner unit, quality supervision stage of supervision unit, and quality supervision stage of government agency. Furthermore, the existing main problems of WPCQMS are analyzed, and it is put forward that the reforming orientation of WPCQMS should establish the three systems, including the main construction body quality management endurance system, the government quality supervision system, and the social credit assessing system.
引用
收藏
页码:2230 / +
页数:2
相关论文
共 50 条
  • [41] The Research of Project Quality Management Model Based on Lean Construction
    Han Yike
    Wang Jianbin
    PROCEEDINGS OF THE 2015 3RD INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE 2015), 2015, 41 : 1209 - 1211
  • [42] Risk management process in construction project
    Liu Renhui
    Tai Shuangliang
    Zhao Qingjie
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 843 - 846
  • [43] Project management in Construction process disturbances
    不详
    BAUINGENIEUR, 2011, 86 : A12 - A12
  • [44] The Whole Process Cost Management of Construction Project Based on Business Process Reengineering
    Yin Yilin
    Yin Linlin
    Wang Chao
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 412 - +
  • [45] THE CONSTRUCTION OF INDUSTRIAL DESIGN EVALUATION SYSTEM BASED ON PROJECT QUALITY MANAGEMENT UNDER THE BACKGROUND OF PSYCHOLOGY
    Huo, Zhenggang
    Zha, Xiaoting
    Shen, Yifan
    PSYCHIATRIA DANUBINA, 2021, 33 : S135 - S137
  • [46] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [47] Research on the Method of the Information Management of Engineering Project Construction process Quality Based on the Mobile Phone APP
    Jiang Pengming
    Zhang Jing
    Yu Shuan
    Cui Xian
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 413 - 418
  • [48] The Risk Management of Medical Insurance Relationship - Based on the Dissipative Structure Theory
    Li Bing
    Li Xinying
    PROCEEDINGS OF 2016 CHINA INTERNATIONAL CONFERENCE ON INSURANCE AND RISK MANAGEMENT, 2016, : 308 - 327
  • [49] Sports Management System Evolution Based on Entropy and Dissipative Structure
    Cheng, Wenguang
    Li, Junyan
    Xue, Hongbo
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 1, 2011, : 135 - 140
  • [50] Dynamic management system of large-scale water conservancy project construction based on ArcGIS
    Wang, Zhenghong
    Zhang, Peng
    Shen, Wennian
    INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050