Spatial Scheduling Optimization Algorithm for Block Assembly in Shipbuilding

被引:9
|
作者
Shang, Zhengyang [1 ]
Gu, Jinan [1 ]
Ding, Wei [1 ]
Duodu, Enock A. [1 ]
机构
[1] Jiangsu Univ, Mech Informat Res Ctr, Zhenjiang 212013, Peoples R China
关键词
SHOP; SYSTEM;
D O I
10.1155/2017/1923646
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Block assembly consumes the majority of processing time and resources in shipbuilding, and the block spatial scheduling (BSS) related to block assembly has been widely studied as the key to improve shipbuilding efficiency. BSS is a complicated NP-hard problem that aims to minimize the makespan. Since each block has specific building time and space constraints, the BSS problem can be hardly found with an acceptable solution by using constant scheduling rules. Thus, in this study, we considered the BSS problem as a time-constrained 3D bin packing mathematical model and proposed an allocation algorithm, best contact algorithm (BCA), that is more suitable for dynamic processes. Then, for global optimization of the BSS problem, we regarded the starting time of each block as a variable and used the genetic algorithm (GA) to operate and optimize the block assembly sequence. Finally, we tested the BCA + GA scheduling system with real data from a shipyard and thereby determined the block scheduling status and the daily utilization rate of the work plate. Comparison shows that the proposed algorithm is able to get shorter makespan and better block scheduling effect; it realized the optimization of the block spatial scheduling dynamically.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project
    Park, C
    Chung, KH
    Park, JC
    Cho, KK
    Baek, TH
    Son, EI
    PRODUCTION PLANNING & CONTROL, 2002, 13 (04) : 342 - 354
  • [22] Block storage yard scheduling of shipbuilding based on shortest-path algorithm
    Zhang, Zhi-Ying
    Shen, Gang
    Liu, Xiang-Rui
    Hu, Xiao-Cai
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (09): : 1982 - 1990
  • [23] A Multi-Objective Memetic Algorithm for a Fuzzy Parallel Blocking Flow Shop Scheduling Problem of Panel Block Assembly in Shipbuilding
    Yang, Zhi
    Liu, Cungen
    Zhang, Shuiming
    Shi, Jun
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2019, 35 (02): : 170 - 181
  • [24] Skid scheduling algorithm for a shipbuilding company
    Yoon, Hoonyong
    Koh, Shiegheun
    Logendran, Rasaratnam
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2774 - 2784
  • [25] Spatiotemporal scheduling method for block construction in shipbuilding
    Wang Lei
    Zhang Zhiying
    Jiang Zhibin
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 29 - 33
  • [26] Optimization of assembly line scheduling based on crossover optimization algorithm
    Yang, Xiang
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 122 - 126
  • [27] Research on scheduling and optimization under uncertain conditions in panel block production line in shipbuilding
    Wang, Chong
    Mao, Puxiu
    Mao, Yunsheng
    Shin, Jong Gye
    INTERNATIONAL JOURNAL OF NAVAL ARCHITECTURE AND OCEAN ENGINEERING, 2016, 8 (04) : 398 - 408
  • [28] A new block assembly method for shipbuilding at sea
    Zhang, Bilin
    Boo, Seung-Hwan
    Kim, Jin-Gyun
    STRUCTURAL ENGINEERING AND MECHANICS, 2015, 54 (05) : 999 - 1016
  • [29] Statistical Procedure for Panel Block Assembly in Shipbuilding
    Otero, Deborah
    Cao, Ricardo
    Blasco, Vicente
    Brage, Alvaro
    Tarrio-Saavedra, Javier
    Naya, Salvador
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2025, 41 (02) : 689 - 703
  • [30] Spatial Scheduling Strategy for Irregular Workplace in Shipbuilding
    Ge, Yan
    Wang, Aimin
    Cheng, Jincheng
    2016 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, 2016, : 12 - 16