Spatial Scheduling Optimization Algorithm for Block Assembly in Shipbuilding

被引:9
|
作者
Shang, Zhengyang [1 ]
Gu, Jinan [1 ]
Ding, Wei [1 ]
Duodu, Enock A. [1 ]
机构
[1] Jiangsu Univ, Mech Informat Res Ctr, Zhenjiang 212013, Peoples R China
关键词
SHOP; SYSTEM;
D O I
10.1155/2017/1923646
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Block assembly consumes the majority of processing time and resources in shipbuilding, and the block spatial scheduling (BSS) related to block assembly has been widely studied as the key to improve shipbuilding efficiency. BSS is a complicated NP-hard problem that aims to minimize the makespan. Since each block has specific building time and space constraints, the BSS problem can be hardly found with an acceptable solution by using constant scheduling rules. Thus, in this study, we considered the BSS problem as a time-constrained 3D bin packing mathematical model and proposed an allocation algorithm, best contact algorithm (BCA), that is more suitable for dynamic processes. Then, for global optimization of the BSS problem, we regarded the starting time of each block as a variable and used the genetic algorithm (GA) to operate and optimize the block assembly sequence. Finally, we tested the BCA + GA scheduling system with real data from a shipyard and thereby determined the block scheduling status and the daily utilization rate of the work plate. Comparison shows that the proposed algorithm is able to get shorter makespan and better block scheduling effect; it realized the optimization of the block spatial scheduling dynamically.
引用
收藏
页数:10
相关论文
共 50 条
  • [11] Spatial scheduling for large assembly blocks in shipbuilding
    Kwon, Bobae
    Lee, Gyu M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 89 : 203 - 212
  • [12] Combined Assembly Block Scheduling in Storage Yard of Shipbuilding
    Meng L.
    Jiang Z.
    Tao N.
    Liu J.
    Li B.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2019, 53 (07): : 780 - 788
  • [13] Integrated Spatial Scheduling of Hull Block Construction in Shipbuilding
    Zhang Zhiying
    Li Zhen
    Wang Lei
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1542 - 1548
  • [14] Spatial Scheduling for assembly blocks in shipbuilding based on rules
    Hu, Jiankun
    Han, Yang Yang
    Wang, Zhihuan
    2018 INTERNATIONAL SYMPOSIUM IN SENSING AND INSTRUMENTATION IN IOT ERA (ISSI), 2018,
  • [15] A spatial scheduling system for block painting process in shipbuilding
    Cho, KK
    Chung, KH
    Park, C
    Park, JC
    Kim, HS
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2001, 50 (01) : 339 - 342
  • [16] An integrated process planning and scheduling system for block assembly in shipbuilding
    Cho, KK
    Oh, JS
    Ryu, KR
    Choi, HR
    CIRP ANNALS 1998 - MANUFACTURING TECHNOLOGY, VOL 47, NO 1, 1998, 47 : 419 - 422
  • [17] Modeling and solving the spatial block scheduling problem in a shipbuilding company
    Park, K
    Lee, K
    Park, S
    Kim, S
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (03) : 357 - 364
  • [18] Spatial block arrangement scheduling in shipbuilding industry using genetic algorithm for obtaining solution for anticipated bottleneck
    Varghese, R
    Yoon, DY
    PROCEEDINGS OF THE FIFTEENTH (2005) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 4, 2005, : 774 - 779
  • [19] A Hybrid Whale Optimization Algorithm for Plane Block Parallel Blocking Flowline Scheduling Optimization With Deterioration Effect in Lean Shipbuilding
    Li, Jinghua
    Guo, Hui
    IEEE ACCESS, 2021, 9 : 131893 - 131905
  • [20] Uncertain processing time based hull block spatial scheduling in shipbuilding
    Zhang, Z. (zyzhang08@tongji.edu.cn), 1600, Editorial Board of Journal of Harbin Engineering (33):