Life Cycle Cost Management Strategy on Corrosion Deterioration and Fatigue Damage of Steel Girder Bridge

被引:0
|
作者
Cheung, Moe M. S. [1 ]
So, Kevin K. L. [1 ]
Zhang, Xueqing [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil Engn, Kowloon, Hong Kong, Peoples R China
来源
关键词
Corrosion; Fatigue; Deflection; Moment; Shear; Condition Index; LCC;
D O I
10.4028/www.scientific.net/KEM.385-387.845
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a life-cycle cost (LCC) management methodology that integrates corrosion deterioration and fatigue damage mechanisms. This LCC management methodology has four characterized features: (1) corrosion deterioration and fatigue damage models are used to predict the time when the pre-defined limits are reached; (2) the performance of the steel girder is measured by condition state sets in which deflection, moment and shear capacities and fatigue strength limits are considered altogether; (3) the cost-effectiveness of management strategies are measured by the performance improvement per unit of money spent; and (4) the LCC model includes initial design/construction cost, inspection cost, maintenance cost, repair/rehabilitation cost and failure cost. A steel girder bridge is used as an example to demonstrate the application of the proposed LCC management methodology.
引用
收藏
页码:845 / 848
页数:4
相关论文
共 50 条
  • [31] Joints Fatigue Damage Prediction for a Steel Truss Suspension Bridge Considering Corrosion Environment
    Weiwei Wu
    Xiongjun He
    Li He
    Chao Wu
    Jia He
    Andong Zhu
    [J]. Arabian Journal for Science and Engineering, 2022, 47 : 4879 - 4892
  • [32] Joints Fatigue Damage Prediction for a Steel Truss Suspension Bridge Considering Corrosion Environment
    Wu, Weiwei
    He, Xiongjun
    He, Li
    Wu, Chao
    He, Jia
    Zhu, Andong
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (04) : 4879 - 4892
  • [33] Repair efficiency and Life-Cycle Cost of RC bridge deck maintenance subjected to spatially variable corrosion damage
    Mullard, J. A.
    Stewart, M. G.
    [J]. APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, 2011, : 2257 - 2265
  • [34] Steel girder bridge cost optimization using AASHTO specifications
    Fenske, TE
    Yener, M
    Liu, D
    Fenske, SM
    [J]. ANALYSIS AND COMPUTATION, 1996, : 472 - 481
  • [35] Life-cycle prediction of steel bridges using reliability-based fatigue deterioration profile: Case study of neka bridge
    Ali Sahrapeyma
    Abdollah Hosseini
    Mohammad. -S. Marefat
    [J]. International Journal of Steel Structures, 2013, 13 : 229 - 242
  • [36] Life-cycle prediction of steel bridges using reliability-based fatigue deterioration profile: Case study of neka bridge
    Sahrapeyma, Ali
    Hosseini, Abdollah
    Marefat, Mohammad. -S.
    [J]. INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2013, 13 (02) : 229 - 242
  • [37] Erratum to: Fatigue life assessment for a composite box girder bridge
    Jun Yong Park
    Ho-Kyung Kim
    [J]. International Journal of Steel Structures, 2015, 15 : 247 - 247
  • [38] Damage experiment on a steel plate girder bridge and vibration based damage detection
    Kim, C. W.
    Goi, Y.
    Mimasu, T.
    Kawatani, M.
    [J]. ADVANCES IN ENGINEERING MATERIALS, STRUCTURES AND SYSTEMS: INNOVATIONS, MECHANICS AND APPLICATIONS, 2019, : 2029 - 2034
  • [39] Fatigue Life Estimation of Welded Plate Girder of Railway Bridge
    Madhekar, Suhasini N.
    Shewale, Dinesh
    [J]. STRUCTURAL INTEGRITY ASSESSMENT, ICONS 2018, 2020, : 671 - 681
  • [40] PREDICTION OF ULTRALOW CYCLE FATIGUE DAMAGE OF THIN-WALLED STEEL BRIDGE PIERS
    Tang, Zhan-Zhan
    Xue, Han-Yang
    Liu, Hong
    Zhang, Wei
    [J]. ADVANCED STEEL CONSTRUCTION, 2021, 17 (04): : 403 - 411