Life Cycle Cost Management Strategy on Corrosion Deterioration and Fatigue Damage of Steel Girder Bridge

被引:0
|
作者
Cheung, Moe M. S. [1 ]
So, Kevin K. L. [1 ]
Zhang, Xueqing [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil Engn, Kowloon, Hong Kong, Peoples R China
来源
关键词
Corrosion; Fatigue; Deflection; Moment; Shear; Condition Index; LCC;
D O I
10.4028/www.scientific.net/KEM.385-387.845
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a life-cycle cost (LCC) management methodology that integrates corrosion deterioration and fatigue damage mechanisms. This LCC management methodology has four characterized features: (1) corrosion deterioration and fatigue damage models are used to predict the time when the pre-defined limits are reached; (2) the performance of the steel girder is measured by condition state sets in which deflection, moment and shear capacities and fatigue strength limits are considered altogether; (3) the cost-effectiveness of management strategies are measured by the performance improvement per unit of money spent; and (4) the LCC model includes initial design/construction cost, inspection cost, maintenance cost, repair/rehabilitation cost and failure cost. A steel girder bridge is used as an example to demonstrate the application of the proposed LCC management methodology.
引用
收藏
页码:845 / 848
页数:4
相关论文
共 50 条
  • [11] Extending fatigue life for steel bridge by girder link method and its verification
    Shokaku, O.
    Aoki, Y.
    Tabata, A.
    Tokumasu, K.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1428 - 1435
  • [12] Deterioration Models for Bridge Pavement Materials for a Life Cycle Cost Analysis
    Han, Daeseok
    Lee, Jin-Hyuk
    Park, Ki-Tae
    [J]. SUSTAINABILITY, 2022, 14 (18)
  • [13] Optimized design and life cycle cost analysis of a duplex welded girder bridge
    Karabulut, B.
    Rossi, B.
    Lombaert, G.
    Debruyne, D.
    [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 2715 - 2722
  • [14] Life-cycle cost analysis of a TPSM applied continuouscomposite girder bridge
    Kim S.-H.
    Kim J.-H.
    Jung C.-Y.
    Ahn J.-H.
    [J]. International Journal of Steel Structures, 2010, 10 (02) : 115 - 129
  • [15] Risk-Cost Optimized Maintenance Strategy for Steel Bridge Subjected to Deterioration
    Li, Le
    Mahmoodian, Mojtaba
    Khaloo, Alireza
    Sun, Zhiyan
    [J]. SUSTAINABILITY, 2022, 14 (01)
  • [16] MAINTENANCE STRATEGY TO OPTIMIZE BRIDGE LIFE-CYCLE COST
    Li, Xin-Ping
    Hong, Yi-Dong
    [J]. 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 249 - 254
  • [17] Life Cycle Cost Analysis of Anticorrosive Coating of Steel Bridge
    Liu, Pan
    [J]. FUNCTIONAL MATERIALS AND NANOTECHNOLOGY, 2012, 496 : 121 - 125
  • [18] Deterioration Models for Life-Cycle Cost Analysis of Bridge Decks in Nebraska
    Hatami, Afshin
    Morcous, George
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2313) : 3 - 11
  • [19] Research on non-damage repair technology for fatigue crack of steel box girder bridge
    Zhou, J.
    Xu, Z.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 1689 - 1696
  • [20] Estimation of life-cycle fatigue damage for suspension bridge hangers
    Petrini, F.
    Bontempi, F.
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 433 - +