Optimal dispatch of generating units of the Itaipu hydroelectric plant

被引:122
|
作者
Arce, A [1 ]
Ohishi, T
Soares, S
机构
[1] Itaipu Binac, Operat Syst Dept, Campinas, Brazil
[2] State Univ Campinas, Fac Elect & Computat Engn, Campinas, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
hydroelectric power generation; optimization method; scheduling; unit commitment;
D O I
10.1109/59.982207
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper is concerned with the optimal dispatch of generating units of Itaipu, the world's largest hydroelectric plant in operation. Itaipu is a 12.6 GW hydro plant, located on the Parana river, in South America, composed of 18 identical 700 MW generating units. A dynamic programming model has been developed to optimize the number of generating units in operation at each hour of the day in order to attain the total generation scheduling of the plant in the most economic way. The model highlights the tradeoff between start-up/shut-down of generating units and hydro power efficiency, taking into account variations in tailrace elevation, penstock head losses and turbine-generator efficiencies. The methodology has been tested for a typical generation scheduling, and the results show that the number of the turbine-generator sets dispatched has a major influence on the overall hydroplant efficiency, and therefore it is a key aspect to be considered in the dispatch of hydro generating units. In the case of ltaipu, the economic benefits, in terms of greater power efficiency with respect to actual operation. are in the range of millions of dollars per year.
引用
收藏
页码:154 / 158
页数:5
相关论文
共 50 条
  • [21] ON-LINE EFFICIENCY MONITORING OF HYDROELECTRIC GENERATING UNITS.
    Streat, N.
    Macdonald, J.A.
    Johnson, R.E.
    Research and Development Report - Canadian Electrical Association, 1982, (0 G112):
  • [22] Self-adaptive governing method for hydroelectric generating units
    Qiao, Jun-Fei
    Sun, Ya-Ming
    Du, Hong-Wei
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2000, 20 (10): : 1 - 4
  • [23] Economic Load Dispatch By Optimal Scheduling of Generating Units using Improved Real Coded Genetic Algorithm
    De, Dipayan
    Saha, Debalina
    Samanta, Tirthankar
    Jana, Debashis
    Palai, Debapriya
    Maji, Aruni
    Ahmad, Syed Wakash
    Poddar, Aishwarya
    Das, Pratyasha
    2017 8TH ANNUAL INDUSTRIAL AUTOMATION AND ELECTROMECHANICAL ENGINEERING CONFERENCE (IEMECON), 2017, : 305 - 308
  • [24] AN APPROXIMATE REASONING APPROACH FOR OPTIMAL DYNAMIC DISPATCH OF THERMAL GENERATING-UNITS INCLUDING AUXILIARY CONTROL
    NIIMURA, T
    YOKOYAMA, R
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 651 - 657
  • [25] Negotiation Model for Generating Units Balancing in Optimal Dispatch Based on Power System Contingencies Using Agents
    Oonsivilai, A.
    Greyson, K. A.
    2010 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: SMART SOLUTIONS FOR A CHANGING WORLD, 2010,
  • [26] Hybrid Fuzzy and Flower Pollination Optimization Algorithm for Optimal Dispatch of Generating Units in the Existence of Electric Vehicles
    Thiruvenkadam, S.
    Kim, Hyung-Jin
    Ra, In-Ho
    2020 6TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTING AND COMMUNICATION SYSTEMS (ICACCS), 2020, : 177 - 183
  • [27] Real-Time Optimal Load Dispatch Recommendation System for the Santo Antônio Hydroelectric Power Plant
    Brunno Henrique Brito
    Airton Isaac Pereira
    Rodrigo Pereira Gosmann
    Erlon Cristian Finardi
    David Lucas dos Santos Abreu
    Fabrício Yutaka Kuwabata Takigawa
    Pablo Toldo Mendes
    Leonardo Augusto Weiss
    Douglas Teixeira Silva de Assis Morais
    Argemiro Fernandes
    Journal of Control, Automation and Electrical Systems, 2022, 33 : 268 - 281
  • [28] Itaipu Hydroelectric Power Plant and the Urbanization Process in the Borderland of Brazil, Paraguay and Argentina: Developments and Contradictions
    Araujo De Souza, Adelita
    Victal Ferreira, Jane
    NEW URBAN CONFIGURATIONS, 2014, : 452 - 458
  • [29] BIOACCUMULATION OF HEAVY METALS AND NUTRIENTS IN THE GOLDEN MUSSEL OF THE RESERVOIR OF THE ITAIPU BINATIONAL HYDROELECTRIC POWER PLANT
    Marengoni, Nilton Garcia
    Klosowski, Elcio Silverio
    de Oliveira, Katiane Pimenta
    Sartorio Chambo, Ana Paula
    Goncalves Junior, Affonso Celso
    QUIMICA NOVA, 2013, 36 (03): : 359 - 363
  • [30] STOCHASTIC OPTIMAL DISPATCH OF COMBINED HEAT AND POWER IN VIRTUAL POWER PLANT WITH CARBON CAPTURE UNITS
    Yuan, Guili
    Zhang, Rui
    Zhao, Xun
    Zhang, Guobin
    Li, Hongbo
    Hang, Chenhui
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2024, 45 (12): : 627 - 636