Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date

被引:20
|
作者
Sakuraba, Celso S. [1 ]
Ronconi, Debora P. [1 ]
Sourd, Francis [2 ]
机构
[1] Univ Sao Paulo, EPUSP, Dept Prod Engn, BR-05508900 Sao Paulo, Brazil
[2] Univ Paris 06, Lab LIP6, F-75252 Paris 05, France
基金
巴西圣保罗研究基金会;
关键词
Scheduling; Earliness and tardiness; Common due date; Flowshop; Heuristics; TARDINESS PENALTIES; COMPLETION TIMES; SINGLE-MACHINE; MINIMIZING EARLINESS; BENCHMARKS; ALGORITHM; ART;
D O I
10.1016/j.cor.2007.07.005
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the minimization of the mean absolute deviation from a common due date in a two-machine flowshop scheduling problem. We present heuristics that use an algorithm, based on proposed properties, which obtains an optimal schedule fora given job sequence. A new set of benchmark problems is presented with the purpose of evaluating the heuristics. Computational experiments show that the developed heuristics outperform results found in the literature for problems up to 500 jobs. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:60 / 72
页数:13
相关论文
共 50 条
  • [41] Scheduling the fabrication and assembly of components in a two-machine flowshop
    Cheng, TCE
    Wang, GQ
    IIE TRANSACTIONS, 1999, 31 (02) : 135 - 143
  • [42] A two-agent scheduling problem in a two-machine flowshop
    Ahmadi-Darani, Mohammad-Hasan
    Moslehi, Ghasem
    Reisi-Nafchi, Mohammad
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (03) : 289 - 306
  • [43] A NOTE ON THE MINIMIZATION OF MEAN SQUARED DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE
    DE, P
    GHOSH, JB
    WELLS, CE
    MANAGEMENT SCIENCE, 1989, 35 (09) : 1143 - 1147
  • [44] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chang, Chia-Ming
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (7-8): : 774 - 782
  • [45] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Yau-Ren Shiau
    Wen-Chiung Lee
    Chin-Chia Wu
    Chia-Ming Chang
    The International Journal of Advanced Manufacturing Technology, 2007, 34 : 774 - 782
  • [46] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chang, Chia-Ming
    International Journal of Advanced Manufacturing Technology, 2007, 34 (7-8): : 774 - 782
  • [47] Two-machine flowshop scheduling problem with coupled-operations
    Nadjat Meziani
    Ammar Oulamara
    Mourad Boudhar
    Annals of Operations Research, 2019, 275 : 511 - 530
  • [48] Scheduling of a two-machine flowshop with travel time between machines
    Panwalkar, S.S.
    Journal of the Operational Research Society, 1991, 42 (07): : 609 - 613
  • [49] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Cheng, Shuenn-Ren
    Yin, Yunqiang
    Wen, Chih-Hou
    Lin, Win-Chin
    Wu, Chin-Chia
    Liu, Jun
    SOFT COMPUTING, 2017, 21 (08) : 2091 - 2103
  • [50] Scheduling of two-machine flowshop with outsourcing lead-time
    Kim, Eun-Seok
    Lee, Ik Sun
    COMPUTERS & OPERATIONS RESEARCH, 2022, 145