Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration

被引:36
|
作者
Shiau, Yau-Ren [1 ]
Lee, Wen-Chiung [1 ]
Wu, Chin-Chia [1 ]
Chang, Chia-Ming [1 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
关键词
production; mean flow time; linear deterioration;
D O I
10.1007/s00170-006-0646-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A real industrial production phenomenon, referred to as deteriorating jobs, has drawn increasing attention. However, most research on this issue considers only single-machine problems. Motivated by this limitation, this paper considers a simple linear deterioration model in a two-machine flowshop where the objective is to minimize the mean flow time. Several dominance rules and three lower bounds are proposed to speed up the search for an optimal solution, and several heuristic algorithms are provided to derive near-optimal solutions. In addition, a computational experiment is conducted to evaluate their performances. Results indicate that the algorithms perform well, and a combined heuristic algorithm is recommended for practitioners.
引用
收藏
页码:774 / 782
页数:9
相关论文
共 50 条
  • [1] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Yau-Ren Shiau
    Wen-Chiung Lee
    Chin-Chia Wu
    Chia-Ming Chang
    The International Journal of Advanced Manufacturing Technology, 2007, 34 : 774 - 782
  • [2] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chang, Chia-Ming
    International Journal of Advanced Manufacturing Technology, 2007, 34 (7-8): : 774 - 782
  • [3] Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
    Wu, Chin-Chia
    Lee, Wen-Chiung
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) : 572 - 584
  • [4] Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration
    Yang, Shu-Hui
    Wang, Ji-Bo
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (09) : 4819 - 4826
  • [5] Two-machine flowshop scheduling to minimize total tardiness
    Pan, JCH
    Fan, ET
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1997, 28 (04) : 405 - 414
  • [6] Batching and scheduling to minimize the makespan in the two-machine flowshop
    Cheng, TCE
    Wang, GQ
    IIE TRANSACTIONS, 1998, 30 (05) : 447 - 453
  • [7] Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop
    Jafari-Nodoushan A.
    Zare H.K.
    Lotfi M.M.
    Tavakkoli-Moghaddam R.
    Operations Research Forum, 2 (4)
  • [8] Two-machine flowshop scheduling with truncated learning to minimize the total completion time
    Li, Der-Chiang
    Hsu, Peng-Hsiang
    Wu, Chin-Chia
    Cheng, T. C. E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 655 - 662
  • [9] Two-machine flowshop scheduling to minimize the number of tardy jobs
    Gupta, JND
    Hariri, AMA
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (02) : 212 - 220
  • [10] Scheduling a two-machine flowshop with travel times to minimize maximum lateness
    Stevens, JW
    Gemmill, DD
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (01) : 1 - 15