摘要
The subsea pipelines between two platforms located in South China Sea were required to be replaced. In between the two platforms is a Floating Production Storage and Offloading (FPSO) unit including the mooring system, anchors and Pipeline End Termination (PLET). The new pipelines need to run below the FPSO and the mooring lines. This paper discusses a new installation method for the subsea pipelines in South China Sea. There are technical challenges to install the new 18-km pipelines in Panyu oil field. On the one hand, it needs to ensure a 500-m radius safety zone from the FPSO. The pipeline laying vessel shall not work within the safety zone due to possible interference with anchor lines. On the other hand, the new pipelines have to run below the FPSO and the mooring lines in order to avoid potential interference with existing cable and riser system. This paper considers the existing pipeline installation methods and generates a new method to install the pipelines in South China Sea. A concept of 'dummy pipe' is introduced to simulate the installation operation. The paper presents a series of installation sequences including assisting the pipeline laying and pulling, accurately positioning the pipelines, and protecting the existing facility. Figures are used to illustrate the installation deployment. Messenger lines were installed to run below the FPSO. The installation process was monitored. The new pipelines were installed in the field successfully. In addition, this paper further presents some recommendation for future installation practice.
引用
收藏
页码:819 / 828
页数:10
相关论文
共 50 条
  • [41] SURVEY OF PIPELINES IN THE NORTH SEA INCIDENTS DURING INSTALLATION, TESTING AND OPERATION.
    Starting, John
    Proceedings of the Annual Offshore Technology Conference, 1981, 3 : 25 - 32
  • [42] South China sea
    Morton, B
    Blackmore, G
    MARINE POLLUTION BULLETIN, 2001, 42 (12) : 1236 - 1263
  • [43] South China sea
    Watkins, RJ
    OIL & GAS JOURNAL, 1999, 97 (46) : 8 - +
  • [44] New Chinese Leadership, New Policy in the South China Sea Dispute?
    Irene Chan
    Mingjiang Li
    Journal of Chinese Political Science, 2015, 20 : 35 - 50
  • [45] New Chinese Leadership, New Policy in the South China Sea Dispute?
    Chan, Irene
    Li, Mingjiang
    JOURNAL OF CHINESE POLITICAL SCIENCE, 2015, 20 (01) : 35 - 50
  • [46] Statistics of sediment mass in the South China Sea: Method and results
    Huang W.
    Wang P.
    Frontiers of Earth Science in China, 2007, 1 (1): : 88 - 96
  • [47] Comprehensive method to determine flow areas of perforation damages in subsea pipelines with culverts
    Huseynli, Elmir, I
    Eminov, Ramiz A.
    Ibrahimov, Arzu E.
    NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2019, 9 (06): : 660 - 665
  • [48] Coupled numerical simulation of pendulous installation method for subsea equipment with dynamic positioning
    Sun L.
    Zhu X.
    Ai S.
    Li B.
    Zhu, Xiaomeng (gavinzhu@126.com), 1689, Editorial Board of Journal of Harbin Engineering (38): : 1689 - 1695
  • [49] Numerical evaluation of a subsea equipment installation method designed to avoid resonant responses
    de Araujo Neto, Eloi Daniel
    Jacovazzo, Bruno Martins
    Correa, Fabricio Nogueira
    Jacob, Breno Pinheiro
    APPLIED OCEAN RESEARCH, 2019, 88 : 288 - 305
  • [50] A real-time non-contact monitoring method of subsea pipelines
    Song, Dalei
    Ma, Xueyan
    Fan, Xinjian
    Hou, Guojia
    Sun, Jixing
    Shi, Weiguo
    Li, Qingzhong
    2015 2ND INTERNATIONAL CONFERENCE ON MECHATRONICS AND MECHANICAL ENGINEERING (ICMME 2015), 2015, 34