摘要
The subsea pipelines between two platforms located in South China Sea were required to be replaced. In between the two platforms is a Floating Production Storage and Offloading (FPSO) unit including the mooring system, anchors and Pipeline End Termination (PLET). The new pipelines need to run below the FPSO and the mooring lines. This paper discusses a new installation method for the subsea pipelines in South China Sea. There are technical challenges to install the new 18-km pipelines in Panyu oil field. On the one hand, it needs to ensure a 500-m radius safety zone from the FPSO. The pipeline laying vessel shall not work within the safety zone due to possible interference with anchor lines. On the other hand, the new pipelines have to run below the FPSO and the mooring lines in order to avoid potential interference with existing cable and riser system. This paper considers the existing pipeline installation methods and generates a new method to install the pipelines in South China Sea. A concept of 'dummy pipe' is introduced to simulate the installation operation. The paper presents a series of installation sequences including assisting the pipeline laying and pulling, accurately positioning the pipelines, and protecting the existing facility. Figures are used to illustrate the installation deployment. Messenger lines were installed to run below the FPSO. The installation process was monitored. The new pipelines were installed in the field successfully. In addition, this paper further presents some recommendation for future installation practice.
引用
收藏
页码:819 / 828
页数:10
相关论文
共 50 条
  • [21] China's New Assertiveness in the South China Sea
    Yahuda, Michael
    JOURNAL OF CONTEMPORARY CHINA, 2013, 22 (81) : 446 - 459
  • [22] DESIGN, INSTALLATION, AND OPERATION DESCRIBED FOR BEAUFORT SEA PIPELINES.
    Timmermans, Willem J.
    Oil and Gas Journal, 1982, 80 (19): : 113 - 120
  • [23] NUMERICAL SIMULATION OF SUBSEA CLUSTER MANIFOLD INSTALLATION BY THE SHEAVE METHOD
    Zhao, Yu
    Wang, Yingying
    Li, Liwei
    Yang, Chao
    Du, Yang
    Chen, Haoran
    Duan, Menglan
    PROCEEDINGS OF THE ASME 37TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2018, VOL 5, 2018,
  • [24] An improved PSO method for optimal design of subsea oil pipelines
    Zhang, Haoran
    Liang, Yongtu
    Ma, Jing
    Shen, Yun
    Yan, Xiaohan
    Yuan, Meng
    OCEAN ENGINEERING, 2017, 141 : 154 - 163
  • [26] NEW SHARKS FROM SOUTH CHINA SEA
    CHAN, WL
    JOURNAL OF ZOOLOGY, 1966, 148 : 218 - &
  • [27] A New Legal Arrangement for the South China Sea?
    Nguyen Hong Thao
    Amer, Ramses
    OCEAN DEVELOPMENT AND INTERNATIONAL LAW, 2009, 40 (04): : 333 - 349
  • [28] THE NEW SILK ROAD IN THE SOUTH CHINA SEA
    Ondrias, Juraj
    INTERNATIONAL RELATIONS 2018: CURRENT ISSUES OF WORLD ECONOMY AND POLITICS, 2018, : 572 - 581
  • [29] Rifting of the South China Sea: new perspectives
    Cullen, Andrew
    Reemst, Paul
    Henstra, Gijs
    Gozzard, Simon
    Ray, Anandaroop
    PETROLEUM GEOSCIENCE, 2010, 16 (03) : 273 - 282
  • [30] Novel installation methods and devices of steel catenary risers (SCR) in the South China Sea
    Ye, Mao
    Duan, Menglan
    Li, Zhigang
    Chen, Ruiyan
    Wang, Yi
    Li, Mingjie
    UNDERWATER TECHNOLOGY, 2013, 31 (02): : 93 - 104