共 50 条
- [43] The model-based Ordering of Materials in a General Contractor - Development of a semi-automated Order Process for the Structural Work [J]. BAUINGENIEUR, 2018, 93 : 447 - 453
- [49] Validation of aortic valve pressure gradient quantification using semi-automated 4D flow CMR pipeline [J]. BMC Research Notes, 15
- [50] An efficient methodology and semi-automated flow for design and validation of complex digital signal processing ASICS macro-cells [J]. 14TH IEEE INTERNATIONAL WORKSHOP ON RAPID SYSTEMS PROTOTYPING, PROCEEDINGS: SHORTENING THE PATH FROM SPECIFICATION TO PROTOTYPE, 2003, : 56 - 63