FRICTION TEST AND PARAMETER ANALYSIS OF PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE

被引:0
|
作者
Yu, Qingxin [1 ,2 ]
Sun, Quansheng [1 ]
Liu, Junyun [1 ]
机构
[1] Northeast Forestry Univ, Dept Civil Engn, Hexing Rd, Harbin, Peoples R China
[2] Lianyungang Econ & Technol Dev Zone Govt Investmen, Huaguoshan Ave, Lianyungang, Peoples R China
来源
关键词
Continuous beam bridge; Initial tensile stress; Loading time; Friction parameters; Deflection; Stress;
D O I
10.14311/CEJ.2023.01.0005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The prestressed ducts of prestressed concrete continuous girder bridges are usually three-dimensionally distributed and long in length. The control of prestress loss during construction is very important. In order to ensure the effect of prestress tensioning, the test and analysis of friction parameters of prestressed ducts are particularly important. Based on the tension process of a prestressed concrete continuous beam bridge, the initial tension stress, loading time and channel friction parameters of the prestressed concrete continuous beam bridge are tested by field tests. Combined with the measured friction parameters, the finite element software Midas / Civil is used to analyse the influence of friction parameters on the mechanical properties of prestressed concrete continuous beam bridge. The results show that when the prestressed steel with bending angle not more than 40 degrees and length not more than 70 m is stretched, the initial tension stress is suggested to be set as 20 % of the tension control force and the loading time is 5 min. The measured tunnel friction parameters are larger than the standard value, and the tension control force should be adjusted during the formal tension construction;The deflection of the key section of the main beam increases with the increase of the friction parameters, and the roof stress decreases with the increase of the friction parameters. The change of channel deviation coefficient has a greater impact on the deflection and roof stress than the change of friction coefficient.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [1] Design and analysis of parameter sensitivity of prestressed concrete continuous beam bridge inconstruction control
    Bao, Longsheng
    Song, Tao
    Yu, Ling
    [J]. Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1063 - 1066
  • [2] Modal Test Analysis of Prestressed Concrete Simply Supported Beam Bridge
    Qi, Shi
    [J]. 2018 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS 2018), 2018, : 86 - 89
  • [3] Construction monitoring of prestressed concrete continuous beam bridge
    Li, Congqi
    Ge, Wenjie
    Cao, Dafu
    Wang, Biyuan
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
  • [4] Static Reliability Analysis of Prestressed Concrete V - Shaped Continuous Beam Bridge
    Ren, Le-ping
    Hu, Wen-liang
    Liang, Sheng-wei
    [J]. PROCEEDINGS OF THE 3RD WORKSHOP ON ADVANCED RESEARCH AND TECHNOLOGY IN INDUSTRY (WARTIA 2017), 2017, 148 : 384 - 392
  • [5] STATIC AND DYNAMIC LOAD TEST OF PRESTRESSED CONCRETE CONTINUOUS BRIDGE
    Zhan, Fa-Yi
    He, Guo-Jing
    Chen, Ai-Jun
    Yi, Jin
    [J]. 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 501 - 505
  • [6] Finite Element Analysis of Prestressed Concrete Continuous Beam Bridge during Operation Period
    Zhang, Fa-Ting
    Chen, Qiao-Yang
    Zhu, Ya-Fei
    He, Wei
    [J]. INTERNATIONAL CONFERENCE ON MECHANICS AND CONTROL ENGINEERING (MCE 2015), 2015, : 158 - 161
  • [7] Static loading test and analysis of prestressed concrete bridge
    Xie, Ruqiang
    Chen, Jianwei
    [J]. 2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [8] TEST TO FAILURE OF A PRESTRESSED CONCRETE BRIDGE
    LIBBY, JR
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1975, 20 (01): : 101 - 102
  • [9] TEST TO FAILURE OF A PRESTRESSED CONCRETE BRIDGE
    BURDETTE, EG
    GOODPAST.DW
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1974, 19 (03): : 92 - 103
  • [10] ANALYSES OF THE EXTREME AXIAL SHORTENING OF THE PARTIAL PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE
    Jiang, De-Zeng
    Wang, Rong-Hui
    Rao, Rui
    [J]. ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 888 - 893