共 50 条
- [1] Finite element analysis of the corrosion prestressed concrete beam [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 3040 - +
- [2] Finite Element Analysis of Reinforced Concrete Aqueduct During Operation Period [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2014, 5 : 1251 - 1254
- [3] Finite Element Analysis of Prestressed Steel Reinforced Concrete Beam [J]. ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING II, PTS 1-3, 2013, 433-435 : 2302 - +
- [4] The Finite Element Analysis of Prestressed Concrete Channel Bridge with Three Girders [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2383 - +
- [5] FINITE-ELEMENT ANALYSIS OF PRESTRESSED CONCRETE VOIDED BRIDGE DECKS [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (03): : 51 - 66
- [6] FRICTION TEST AND PARAMETER ANALYSIS OF PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 32 (01): : 54 - 69
- [7] Finite Element Model updating of a prestressed concrete continuous bridge based on dynamic monitoring [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1645 - 1650
- [8] Construction monitoring of prestressed concrete continuous beam bridge [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
- [9] Nonlinear Finite Element Analysis on Statically Indeterminate Prestressed Concrete Beam [J]. ADVANCED COMPOSITE MATERIALS, PTS 1-3, 2012, 482-484 : 647 - +