FRICTION TEST AND PARAMETER ANALYSIS OF PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE

被引:0
|
作者
Yu, Qingxin [1 ,2 ]
Sun, Quansheng [1 ]
Liu, Junyun [1 ]
机构
[1] Northeast Forestry Univ, Dept Civil Engn, Hexing Rd, Harbin, Peoples R China
[2] Lianyungang Econ & Technol Dev Zone Govt Investmen, Huaguoshan Ave, Lianyungang, Peoples R China
来源
关键词
Continuous beam bridge; Initial tensile stress; Loading time; Friction parameters; Deflection; Stress;
D O I
10.14311/CEJ.2023.01.0005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The prestressed ducts of prestressed concrete continuous girder bridges are usually three-dimensionally distributed and long in length. The control of prestress loss during construction is very important. In order to ensure the effect of prestress tensioning, the test and analysis of friction parameters of prestressed ducts are particularly important. Based on the tension process of a prestressed concrete continuous beam bridge, the initial tension stress, loading time and channel friction parameters of the prestressed concrete continuous beam bridge are tested by field tests. Combined with the measured friction parameters, the finite element software Midas / Civil is used to analyse the influence of friction parameters on the mechanical properties of prestressed concrete continuous beam bridge. The results show that when the prestressed steel with bending angle not more than 40 degrees and length not more than 70 m is stretched, the initial tension stress is suggested to be set as 20 % of the tension control force and the loading time is 5 min. The measured tunnel friction parameters are larger than the standard value, and the tension control force should be adjusted during the formal tension construction;The deflection of the key section of the main beam increases with the increase of the friction parameters, and the roof stress decreases with the increase of the friction parameters. The change of channel deviation coefficient has a greater impact on the deflection and roof stress than the change of friction coefficient.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [31] Monitoring prestressed concrete box-beam bridge for superloads
    Hag-Elsafi, O
    Kunin, J
    [J]. DESIGN OF STRUCTURES 2004, 2004, (1892): : 126 - 136
  • [32] Research on Deflection and Cracking of Prestressed Concrete Continuous Girder Bridge
    Guo, Fan
    Yang, Yongqing
    Huang, Shengqian
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1014 - 1017
  • [33] Seismic Response Analysis of Prestressed Concrete Bridge
    Zhang, Tao
    Pan, Deng
    Yue, Jinchao
    [J]. MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 675 - 678
  • [34] Prestressed Concrete Continuous Girder bridge Reinforcement Simulation Analysis and Carrying Capacity Assessment
    Yu, Ling
    Qiao, Tiezhu
    Bao, Longsheng
    Zhu, Guangshan
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1516 - 1521
  • [35] Parameter Sensitivity Analysis of Shrinkage Effects on Concrete Continuous Girder Bridge
    Hao, Xiaotian
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1000 - 1003
  • [36] Concrete Creep Analysis Method Based on a Long-Term Test of Prestressed Concrete Beam
    Yang, Mingfang
    Jin, Song
    Gong, Jinxin
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [37] Test research on prestressed beam of inorganic polymer concrete
    Huihong Liu
    Zhean Lu
    Ziqiang Peng
    [J]. Materials and Structures, 2015, 48 : 1919 - 1930
  • [38] Incremental impact test and simulation of prestressed concrete beam
    Ishikawa, N
    Katsuki, S
    Takemoto, K
    [J]. STRUCTURES UNDER SHOCK AND IMPACT VII, 2002, 11 : 489 - 498
  • [39] Test research on prestressed beam of inorganic polymer concrete
    Liu, Huihong
    Lu, Zhean
    Peng, Ziqiang
    [J]. MATERIALS AND STRUCTURES, 2015, 48 (06) : 1919 - 1930
  • [40] THE STATIC LOAD TEST ANALYSIS OF ONE BONDED PRESTRESSED CONCRETE BOX BEAM
    Rong, Xian
    Zhao, Yuting
    Zhang, Qingwen
    [J]. Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1002 - 1007