Risk Identification of Building Construction Projects in Egypt

被引:16
|
作者
Yousri, Elhosin [1 ]
Sayed, Ahmed El Badawy [2 ]
Farag, Moataz A. M. [3 ]
Abdelalim, Ahmed Mohammed [4 ]
机构
[1] Minia Univ, Fac Engn, Menia 2431436, Egypt
[2] Minia Univ, Fac Engn, Mat Sci, Menia 2431436, Egypt
[3] Minia Univ, Fac Engn, Construct Project Management, Menia 2431436, Egypt
[4] Mataria Helwan Univ, Fac Engn, Construct Engn & Project Management, Helwan, Egypt
关键词
risk management; risk identification; construction project; quantitative risk analysis; MANAGEMENT;
D O I
10.3390/buildings13041084
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk identification is integral to construction management. The severe consequences of identified risk factors on time and cost performance can be addressed by improved risk management. The identification and preparation of responses to risk factors affects the risk management process directly and indirectly. Recent changes in the valuation of the Egyptian currency against foreign currencies during the last year and measures to cut down on the importation of engineering materials and equipment have had significant effects on the existing and recognized regulations concerning construction in Egypt. A pilot survey with expert engineers is a crucial step in completing research. In this research study, 15 experts were asked to discuss the collected risk factors from previous studies to verify the workability of these factors in Egypt. Thirty-five risk factors were selected during the pilot survey, which was distributed to 95 participants. To facilitate the analysis process, the collection was based on a five-point Likert scale. Therefore, redefining and arranging the risks according to the current circumstances is the main objective of this study. The proposed model identified different high-risk factors that could cumulatively affect overall performance, such as funding problems from contractors, material price fluctuations, unrealistic estimates of the duration of project activities, and shortages of construction materials in the market. Thus, to help stakeholders achieve project success, these high-risk factor components should be identified and controlled duly.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [2] A risk identification procedure for construction contracts - a case study of power station projects in Egypt
    Hassanein, Amr A. G.
    Afify, Hala M. F.
    [J]. CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2007, 24 (01) : 3 - 14
  • [3] Estimation of Risk Levels for Building Construction Projects
    Maselli, Gabriella
    Nestico, Antonio
    De Mare, Gianluigi
    Merino Gomez, Elena
    Macchiaroli, Maria
    Dolores, Luigi
    [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2020, PT III, 2020, 12251 : 836 - 851
  • [4] Building Information Modelling Plan of Work for Managing Construction Projects in Egypt
    Amin, K. F.
    Abanda, Fonbeyin Henry
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2019, 24 (02) : 23 - 61
  • [5] Owner Time and Cost Contingency Estimation for Building Construction Projects in Egypt
    Nawar, Seif
    Hosny, Ossama
    Nassar, Khaled
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 367 - 377
  • [6] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2022, : 25 - 36
  • [7] Development of Risk Identification and Risk Analysis in Construction Projects
    Shen, JianHong
    Cao, XiuFeng
    [J]. PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 412 - 415
  • [8] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (01) : 25 - 36
  • [9] The method of identification and quantification of construction projects risk
    Department of Construction Engineering, Civil Engineering Faculty, Land Forces Military Academy, Wroclaw, Poland
    [J]. 1600, 647-662 (2005):
  • [10] Identification and risk management related to construction projects
    Boughaba, Amina
    Bouabaz, Mohamed
    [J]. ADVANCES IN COMPUTATIONAL DESIGN, 2020, 5 (04): : 445 - 465