Assessment of Rock Slope Stability in a Humid Tropical Region: Case Study of a Coal Mine in South Kalimantan, Indonesia

被引:2
|
作者
Zulfahmi, Zulfahmi [1 ]
Sarah, Dwi [1 ]
Novico, Franto [1 ]
Susilo, Robertus B. [2 ]
机构
[1] Natl Res & Innovat Agcy, Res Ctr Geol Resources, Bandung 40135, West Java, Indonesia
[2] PT Tanjung Alam Jaya, Banjarbaru 70714, South Kalimanta, Indonesia
来源
RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK | 2023年 / 38卷 / 02期
关键词
Highwall mining; stability; empirical; analytical; numerical modelling; SOFT-ROCK; HIGHWALL; FAILURE; PILLAR;
D O I
10.17794/rgn.2023.2.8
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
PT.X, a coal mining company in South Kalimantan, Indonesia, plans to use the highwall mining method to excavate marginal reserves on the final slope to maintain production. However, the stability of the slope and determination of the highwall mining dimensions are major concerns due to unfavourable rock mass conditions caused by intensive weathering and tectonics. This paper aims to evaluate the feasibility of highwall mining in the study area using empirical, analytical and numerical methods. The innovation of this research is the integration of these methods, which include rock mass classification, analytical calculation of load and rock support strength, 2D and 3D numerical modelling, and estimation of recovered coal from the highwall design. The initial condition assessment using rock mass classification and analytics calculation of the mining geometry model determined mine openings and pillar dimensions. Numerical modelling re-evaluated the geometry models to obtain an optimal design. The suggested optimal thickness, mine opening, web pillars, and barrier pillars are 3.20, 3.00, 3.50, and 4.00 m, respectively, with four web pillars in one panel at Seam-C and 2.50, 3.00, 3.50, and 4.00 m with four web pillars in one panel at Seam-D. The recovery of coal for Seam-C and SeamD is estimated to be 40.54%. Deformation was found to have the closest relationship with the dimensions of the mine opening, and the safety factor is most sensitive to changes in the depth of the mine opening. This study provides a reference for future highwall mining in Indonesia and other regions with similar conditions.
引用
收藏
页码:109 / 125
页数:17
相关论文
共 50 条
  • [21] Sustainability Assessment of Humid Tropical Watershed: A Case of Batang Merao Watershed, Indonesia
    Firdaus, Rachmad
    Nakagoshi, Nobukazu
    Idris, Aswandi
    4TH INTERNATIONAL CONFERENCE ON SUSTAINABLE FUTURE FOR HUMAN SECURITY SUSTAIN 2013, 2014, 20 : 722 - 731
  • [22] Assessment of the rock slope stability of Fushun West Open-pit Mine
    Zhang F.
    Yang T.
    Li L.
    Bu J.
    Wang T.
    Xiao P.
    Arabian Journal of Geosciences, 2021, 14 (15)
  • [23] APPLICATION OF QUADPOLARIMETRIC TERRASAR-X DATA FOR LANDCOVER CHARACTERIZATION IN TROPICAL REGIONS - A CASE STUDY IN SOUTH KALIMANTAN, INDONESIA
    Ullmann, Tobias
    Lumsdon, Parivash
    Poncet, Felicitas V.
    Esch, Thomas
    Lang, Oliver
    Tinz, Marek
    Kuntz, Steffen
    Dech, Stefan
    2012 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2012, : 5133 - 5136
  • [24] Stability of inner dump slope under coal pillar support: case study in an open-pit coal mine
    Li, Guanghe
    Yang, Xiaoxu
    Wang, Dong
    Wang, Yanting
    Yu, Xiangyu
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2022, 9 (01)
  • [25] Stability of inner dump slope under coal pillar support: case study in an open-pit coal mine
    Guanghe Li
    Xiaoxu Yang
    Dong Wang
    Yanting Wang
    Xiangyu Yu
    International Journal of Coal Science & Technology, 2022, 9
  • [26] An analytical solution for critical sliding surface of stepped rock slope: a case study of Xinjing coal mine landslide
    Xiaocheng Huang
    Guilin Wang
    Lulu Zhang
    Bulletin of Engineering Geology and the Environment, 2025, 84 (2)
  • [27] CASE STUDY OF ROCK BOLTING IN A DEEP COAL MINE IN POLAND
    Masny, Wojciech
    Nita, Lukasz
    Ficek, Jerzy
    ARCHIVES OF MINING SCIENCES, 2022, 67 (01) : 79 - 94
  • [28] Risk assessment of operating slope stability at Loy Yang Coal Mine overburden dump
    Kacavenda, S
    Zou, JZ
    LANDSLIDES-BK, 1996, : 1613 - 1618
  • [29] An Integration of Hydrogeology and Geotechnical Engineering for the Design of the Tutupan Coal Mine T100 Low Wall, South Kalimantan, Indonesia
    Waterhouse, John
    Crisostomo, Joseph
    Nolan, David
    Dutton, Anthony
    MINE WATER AND THE ENVIRONMENT, PROCEEDINGS, 2008, : 81 - +
  • [30] Assessment of polycyclic aromatic hydrocarbons (PAHs) contamination in surface soil of coal stockpile sites in South Kalimantan, Indonesia
    Andy Mizwar
    Bambang Joko Priatmadi
    Chairul Abdi
    Yulinah Trihadiningrum
    Environmental Monitoring and Assessment, 2016, 188