Assessment of the rock slope stability of Fushun West Open-pit Mine

被引:11
|
作者
Zhang F. [1 ,2 ,3 ]
Yang T. [4 ]
Li L. [4 ]
Bu J. [1 ,2 ]
Wang T. [1 ,2 ,3 ]
Xiao P. [5 ]
机构
[1] State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, Shijiazhuang Tiedao University, Shijiazhuang
[2] School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang
[3] Key Laboratory of Roads and Railway Engineering Safety Control (Shijiazhuang Tiedao University), Ministry of Education, Shijiazhuang
[4] Center of Rock Instability and Seismicity Research, School of Resources and Civil Engineering, Northeastern University, Shenyang, 110819, Liaoning
[5] West Open-pit Mine of Fushun Mining Group, Fushun, 113001, Liaoning
基金
中国国家自然科学基金;
关键词
High-steep slope; Planar failure slope; Rock mass rating; Slope mass rating; Slope stability;
D O I
10.1007/s12517-021-07815-8
中图分类号
学科分类号
摘要
The stability of the slope is directly related to the safety operation of the open-pit and the life safety of personnel. Effective evaluation of slope stability can reduce the loss caused by slope disasters such as the Fushun West Open-pit Mine. In recent years, some damage has occurred in the south slope of the mine. Therefore, a progressive research method combining the rock mass classification system, slope mass rating method and numerical method is proposed in this study to analyze the possible failure mode and deformation mechanism of the slope. The digital photogrammetry technology, borehole television technology, infrared scanning technology, and on-site monitoring are combined to obtain the relevant data needed for the method. Based on the rock mass characteristics and the survey on-site, the quality of the rock mass of the slope was evaluated through the rock mass classification system and the borehole TV technique. The slope mass classification system with essential adjustment factors considering the discontinuities and excavation methods are a feasible method to estimate rock slope stability. Thereafter the stability of the south slope was estimated by using the slope mass rating method. The results indicate that the stability of the slope is controlled by the weak bedding plane prone to planar failure. Additionally, the deformation mechanism and potential failure dimensions were analyzed through numerical method. Incorporating the empirical result with the numerical result indicates that the south slope is in limit equilibrium state and susceptible to failure along bedding planes. The resulting of the slope stability was validated using the monitoring data that obtained by the GPS devices in situ. According to the deformation characteristics, the corresponding reinforcement methods were established and achieved good result. The progressive methodology provides an effective way to assess the stability and serves for the formulation reinforcement scheme of the rock slope in the complex geological conditions. © 2021, Saudi Society for Geosciences.
引用
收藏
相关论文
共 50 条
  • [1] Formation of pit lake and slope stability following mine closure: a case study of Fushun West Open-pit Mine
    Gao, Yuan
    Li, Jinduo
    Yang, Tianhong
    Meng, Lei
    Deng, Wenxue
    Zhang, Penghai
    [J]. GEOMATICS NATURAL HAZARDS & RISK, 2024, 15 (01)
  • [2] Cooperative monitoring and numerical investigation on the stability of the south slope of the Fushun west open-pit mine
    Fei Zhang
    Tianhong Yang
    Lianchong Li
    Zhi Wang
    Ping Xiao
    [J]. Bulletin of Engineering Geology and the Environment, 2019, 78 : 2409 - 2429
  • [3] Cooperative monitoring and numerical investigation on the stability of the south slope of the Fushun west open-pit mine
    Zhang, Fei
    Yang, Tianhong
    Li, Lianchong
    Wang, Zhi
    Xiao, Ping
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (04) : 2409 - 2429
  • [4] A new prediction model for rock slope failure time: a case study in West Open-Pit mine, Fushun, China
    Lei Nie
    Zechuang Li
    Yan Lv
    Hongfei Wang
    [J]. Bulletin of Engineering Geology and the Environment, 2017, 76 : 975 - 988
  • [5] A new prediction model for rock slope failure time: a case study in West Open-Pit mine, Fushun, China
    Nie, Lei
    Li, Zechuang
    Lv, Yan
    Wang, Hongfei
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2017, 76 (03) : 975 - 988
  • [6] Stability and Deformation Analysis for Excavation and Backfilling of Fushun West Open-pit Coal Mine
    Yan Yongcheng
    Ling Xianzhang
    Zhang Feng
    Wang Jiahui
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 751 - 755
  • [7] Discussion on the stability evaluation standard of a rock slope in a noncoal open-pit mine
    Wu, Shun-Chuan
    He, Peng-Bin
    Cheng, Hai-Yong
    Wang, Guang-He
    Zhang, Xiao-Qiang
    Zhang, Zhong-Xin
    [J]. Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2022, 44 (05): : 876 - 885
  • [8] Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine
    Ning Fang
    Ji Changsheng
    Crusoe, Garmondyu E., Jr.
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (05) : 869 - 875
  • [9] Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine
    Ning Fang
    Ji Changsheng
    Garmondyu E.Crusoe Jr.
    [J]. International Journal of Mining Science and Technology, 2016, 26 (05) : 869 - 875
  • [10] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    [J]. FRONTIERS IN EARTH SCIENCE, 2023, 10