Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

被引:1
|
作者
Wang, Jingjing [1 ,2 ]
Liu, Huimin [1 ]
Wang, Zongxi [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
[2] Qingdao Univ Technol, Ctr Struct Acoust & Machine Fault Diag, Qingdao 266525, Peoples R China
基金
中国国家自然科学基金;
关键词
Stochastic project scheduling; Multi-stage prefabricated building construction; Duration reliability; DEPSO; DIFFERENTIAL EVOLUTION; ACTIVITY DURATIONS; SERIAL METHOD; RESOURCE; MODEL; MAKESPAN;
D O I
10.1007/s12205-023-2164-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates a project scheduling problem of prefabricated building (PB) construction in an uncertain environment. Different from the traditional scheduling models in PB construction, we consider a complex multi-stage cooperation system including the production, transportation and assembly (PTA) phases. In this system, both activity durations and resource amounts are stochastic variables. By applying the reliability theory to the stochastic scheduling model innovatively, we formulate a duration reliability model to maximize the probability of non-delayed project completion, within the resource constraints. As the proposed model is a non-deterministic polynomial hard (NP-hard) problem, a hybrid meta-heuristic differential evolution particle swarm optimization (DEPSO) algorithm is developed, which is utilized the mutation factor of the differential evolution (DE) algorithm in the framework of the particle swarm optimization (PSO). Finally, a real-life example of a PB construction project is used to explore the performance of the proposed DEPSO algorithm. The result shows that the hybrid algorithm DEPSO can better find the global optimal solution in the multi-dimensional optimization problem.
引用
收藏
页码:2356 / 2371
页数:16
相关论文
共 50 条
  • [41] Optimization of multi-stage pyrolysis
    Oyedun, Adetoyese Olajire
    Lam, Ka Leung
    Gebreegziabher, Tesfaldet
    Hui, Chi Wai
    APPLIED THERMAL ENGINEERING, 2013, 61 (01) : 123 - 127
  • [42] Charge Scheduling of a Plug-in Electric Vehicle Considering Load Demand Uncertainty based on Multi-stage Stochastic Optimization
    Hafiz, Faeza
    de Quieroz, Anderson R.
    Husain, Iqbal
    Fajri, Poria
    2017 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2017,
  • [43] Multi-stage Optimization of Matchings in Trees with Application to Kidney Exchange
    Mankowski, Michal
    Moshkov, Mikhail
    ROUGH SETS, 2017, 10313 : 123 - 130
  • [44] An application of cyclical master production scheduling in a multi-stage, multi-product environment
    Van den Broecke, F
    Van Landeghem, H
    Aghezzaf, EH
    PRODUCTION PLANNING & CONTROL, 2005, 16 (08) : 796 - 809
  • [45] Application of Compound Option Theory for Evaluating Multi-Stage Investment Project
    Chen Huili
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1405 - 1408
  • [46] Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1447 - 1456
  • [47] A multi-stage stochastic programming for lot-sizing and scheduling under demand uncertainty
    Hu, Zhengyang
    Hu, Guiping
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 119 : 157 - 166
  • [48] Stochastic single machine scheduling problem as a multi-stage dynamic random decision process
    Mina Roohnavazfar
    Daniele Manerba
    Lohic Fotio Tiotsop
    Seyed Hamid Reza Pasandideh
    Roberto Tadei
    Computational Management Science, 2021, 18 : 267 - 297
  • [49] Stochastic single machine scheduling problem as a multi-stage dynamic random decision process
    Roohnavazfar, Mina
    Manerba, Daniele
    Fotio Tiotsop, Lohic
    Pasandideh, Seyed Hamid Reza
    Tadei, Roberto
    COMPUTATIONAL MANAGEMENT SCIENCE, 2021, 18 (03) : 267 - 297
  • [50] Multi-stage ordinal optimization based approach for job shop scheduling problems
    Horng, Shih-Cheng
    Lin, Shin-Yeu
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (03) : 1125 - 1134