Mechanical properties of an innovative steel-concrete joint for high-speed railway long-span hybrid girder cable-stayed bridges

被引:4
|
作者
Shi, Zhou [1 ,2 ]
Gu, Jiachang [1 ]
Li, Yingming [1 ]
Zhang, Ying [1 ]
Zhao, Xupo [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Dept Bridge Engn, Sect 111 Northbound 1,Second Ring Rd, Chengdu 610031, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Natl Key Lab Bridge Intelligent & Green Construct, Chengdu 611756, Sichuan, Peoples R China
关键词
High-speed railway; Hybrid cable-stayed bridge; Steel -concrete joint; Model test; Force transfer mechanism; Bearing plate; Parametric analysis;
D O I
10.1016/j.engstruct.2023.117170
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates the mechanical properties of an innovative steel-concrete joint (SCJ) in a four-line long-span high-speed railway hybrid girder cable-stayed bridge with a main span of 672 m. Tests were conducted on a partial 3:8 scale model, supported by nonlinear finite element analysis (FEA), and the results of both were used to derive and validate mathematical formulae for bearing plate force transfer. The results revealed an uneven transverse distribution of stress in the SCJ, with a larger stress observed in the edge box. The non-uniformity coefficient lambda i is defined as the ratio of the absolute maximum stress to the transverse cross-sectional average at a given location, and lambda i,max of steel and concrete in the SCJ were 1.59 and 1.68, respectively. Drastic stress changes appeared in the bearing plate in the longitudinal direction. The maximum measured slip was relatively small, indicating that the steel and concrete in the SCJ functioned cooperatively. Concrete cracks observed in physical tests were mainly distributed in the edge box of the steel and concrete segments, revealing the superior force performance of the SCJ compared to the steel and concrete segments. The deformations of the SCJ changed elastically with an increasing load and satisfied Chinese standards. The bearing plate transferred approximately 59.92% of the axial force and dominated the force transfer. Formulae for the force transfer of the bearing plate were derived based on the stress characteristics of the innovative SCJ, revealing that, rather than its thickness, the bearing plate mainly relied on welds connecting the top and bottom plates and ribs to transfer force. Parameter analysis of the weld sizes of the bearing plate based on the derived formulae and FEA indicated that a reasonable thickness of the bearing plate is 38-60 mm, based on the matched weld sizes. The SCJ structure, the formulae for bearing plate force transfer, and the optimal bearing plate thickness can serve as valuable references during the initial design phase of SCJs.
引用
收藏
页数:15
相关论文
共 50 条
  • [22] Theoretical and Experimental Study on Cable-to-girder Anchorages in Long-span Cable-stayed Bridges with Steel Box Girder
    Wei, Xing
    Li, Jun
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1315 - 1318
  • [23] Mechanical behavior of steel-concrete joint with rear bearing plate in hybrid girder of cable-stayed bridge
    Liu, Rong
    Liu, Yu-Qing
    Wu, Ding-Jun
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2009, 41 (SUPPL. 2): : 196 - 200
  • [24] Model Test for Steel-Concrete Joint Section of Hybrid Girder Cable-Stayed Bridge
    Tang, Xi-Biao
    Wang, Ya-Fei
    Wu, Xian-Zhi
    He, Zu-Fa
    Bridge Construction, 2019, 49 : 92 - 97
  • [25] Study on mechanics behavior and fatigue performance of steel-concrete composite joints of railway hybrid girder cable-stayed bridges
    Zhou, Yang
    Pu, Qianhui
    Shi, Zhou
    Liu, Zhenbiao
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 (11): : 77 - 83
  • [26] The cable force determination and optimization of the long-span concrete cable-stayed bridges
    Yang, Mei-Liang
    Li, Chuan-Xi
    Zhang, Jian-Ren
    STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 690 - 695
  • [27] Multi-scale damage analysis for steel box girder of long-span cable-stayed bridges
    Ding, You-Liang
    Li, Ai-Qun
    Miao, Chang-Qing
    Gongcheng Lixue/Engineering Mechanics, 2007, 24 (07): : 99 - 103
  • [28] Fatigue Performance of Butt-Welded Tensile Plate Cable-Girder Anchorages of Long-Span Cable-Stayed Steel Box Girder Railway Bridges
    Shi, Zhou
    Sun, Zhitao
    Yang, Shili
    Zhou, Kaixuan
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (01)
  • [29] Fatigue Characteristics of Ballastless Track System on the Long-span Cable-stayed Bridge of High-speed Railway
    Yan, Bin
    Yan, Han
    Huang, Jie
    Lou, Ping
    Journal of Railway Engineering Society, 2020, 37 (11) : 43 - 48
  • [30] Ganjiang Bridge: A High-Speed Railway Long-Span Cable-Stayed Bridge Laying Ballastless Tracks
    Sheng, Xingwang
    Zheng, Weiqi
    Zhu, Zhihui
    Yan, Aiguo
    Qin, Yongping
    STRUCTURAL ENGINEERING INTERNATIONAL, 2021, 31 (01) : 40 - 44