Mechanical properties of an innovative steel-concrete joint for high-speed railway long-span hybrid girder cable-stayed bridges

被引:4
|
作者
Shi, Zhou [1 ,2 ]
Gu, Jiachang [1 ]
Li, Yingming [1 ]
Zhang, Ying [1 ]
Zhao, Xupo [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Dept Bridge Engn, Sect 111 Northbound 1,Second Ring Rd, Chengdu 610031, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Natl Key Lab Bridge Intelligent & Green Construct, Chengdu 611756, Sichuan, Peoples R China
关键词
High-speed railway; Hybrid cable-stayed bridge; Steel -concrete joint; Model test; Force transfer mechanism; Bearing plate; Parametric analysis;
D O I
10.1016/j.engstruct.2023.117170
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates the mechanical properties of an innovative steel-concrete joint (SCJ) in a four-line long-span high-speed railway hybrid girder cable-stayed bridge with a main span of 672 m. Tests were conducted on a partial 3:8 scale model, supported by nonlinear finite element analysis (FEA), and the results of both were used to derive and validate mathematical formulae for bearing plate force transfer. The results revealed an uneven transverse distribution of stress in the SCJ, with a larger stress observed in the edge box. The non-uniformity coefficient lambda i is defined as the ratio of the absolute maximum stress to the transverse cross-sectional average at a given location, and lambda i,max of steel and concrete in the SCJ were 1.59 and 1.68, respectively. Drastic stress changes appeared in the bearing plate in the longitudinal direction. The maximum measured slip was relatively small, indicating that the steel and concrete in the SCJ functioned cooperatively. Concrete cracks observed in physical tests were mainly distributed in the edge box of the steel and concrete segments, revealing the superior force performance of the SCJ compared to the steel and concrete segments. The deformations of the SCJ changed elastically with an increasing load and satisfied Chinese standards. The bearing plate transferred approximately 59.92% of the axial force and dominated the force transfer. Formulae for the force transfer of the bearing plate were derived based on the stress characteristics of the innovative SCJ, revealing that, rather than its thickness, the bearing plate mainly relied on welds connecting the top and bottom plates and ribs to transfer force. Parameter analysis of the weld sizes of the bearing plate based on the derived formulae and FEA indicated that a reasonable thickness of the bearing plate is 38-60 mm, based on the matched weld sizes. The SCJ structure, the formulae for bearing plate force transfer, and the optimal bearing plate thickness can serve as valuable references during the initial design phase of SCJs.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Mechanical behavior of an innovative steel-concrete joint for long-span railway hybrid box girder cable-stayed bridges
    Yao, Yadong
    Yan, Meng
    Shi, Zhou
    Wang, Yan
    Bao, Yi
    ENGINEERING STRUCTURES, 2021, 239
  • [2] Fatigue Performance of an Innovative Steel-Concrete Joint in Long-Span Railway Hybrid Box Girder Cable-Stayed Bridges
    Pu, Qianhui
    Yang, Shili
    Shi, Zhou
    Hong, Yu
    Zhou, Yang
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (02)
  • [3] Mechanical Property Analysis of Steel-Concrete Joint Section of Long-Span High-Speed Railway Hybrid Girder Cable-Stayed Bridge
    Shi, Zhou
    Jiang, Xing-Hong
    Gao, Gui
    Ning, Bo-Wei
    Yu, Ming-Deng
    Bridge Construction, 2021, 51 (02) : 62 - 70
  • [4] Fatigue Performance of a Novel Steel-Concrete Joint of a Long-Span High-Speed Railway Hybrid Girder-Cable-Stayed Bridge
    Shi, Zhou
    Li, Yingming
    Yang, Yi
    Zhao, Xupo
    Yu, Wanqing
    JOURNAL OF BRIDGE ENGINEERING, 2024, 29 (01)
  • [5] Study of Mechanical Property of Main Girder for Long-Span Steel-Concrete Composite Girder Cable-Stayed Bridge
    Chen, Guo-Hong
    Xu, Zhao
    Bridge Construction, 2019, 49 (05) : 39 - 44
  • [6] Crack Resistance of Steel-Concrete Hybrid Joint between Concrete Girder and Steel-Concrete Composite Girder in Long-Span Cable-Stayed Bridge under Hogging Moment
    Liang, Huanwei
    Tan, Ke
    Deng, Kailai
    Zhang, Yongming
    Zhao, Canhui
    Yang, Tengyu
    JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (02)
  • [7] Study on static performance of the steel-concrete joint in a high-speed railway hybrid girder low tower cable-stayed bridge
    Wang, Haibo
    Yang, Liang
    Zeng, Haozhe
    STRUCTURES, 2025, 71
  • [8] Study on Mechanical Behaviour of Steel-Concrete Joint of High-speed Railway Hybrid Girder Cable-stayed Bridge with Twin-box Section
    Yang S.
    Shi Z.
    Pu Q.
    Jiang X.
    Zeng M.
    Liu Z.
    Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (10): : 150 - 160
  • [9] Mechanical behaviour of steel-concrete joint in hybrid girder cable-stayed bridge
    Zhao, Lanting
    Pu, Guangning
    Yuan, Yangguang
    Guo, Qi
    Yu, Yongliang
    STRUCTURES, 2023, 57
  • [10] Load transfer mechanism of steel-concrete joint in hybrid girder cable-stayed bridges
    Wang, Taiqi
    Liu, Yuqing
    Wang, Shumin
    Ma, Guang
    Yang, Xinran
    Wang, Sihao
    Journal of Constructional Steel Research, 2025, 230