A bi-objective optimization for finance-based and resource-constrained robust project scheduling

被引:7
|
作者
Liu, Wanlin [1 ,2 ]
Zhang, Jingwen [1 ,3 ]
Liu, Cuifang [1 ]
Qu, Chunli [2 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Peoples R China
[2] Sichuan Agr Univ, Sch Architecture & Urban Rural Planning, Chengdu 611830, Peoples R China
[3] Northwestern Polytech Univ, Sch Management, 127 West Youyi Rd, Xian 710072, Shaanxi Provinc, Peoples R China
基金
中国国家自然科学基金;
关键词
Finance-based project; Robust project scheduling; Bi-objective optimization; NET PRESENT VALUE; GENETIC ALGORITHM; CONSTRUCTION PROJECTS; HEURISTIC PROCEDURES; CASH FLOWS; NSGA-II; MANAGEMENT; MAXIMIZE; NETWORK; MODEL;
D O I
10.1016/j.eswa.2023.120623
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Numerous finance-based projects encounter disturbances from a variety of uncertain factors during their execution, under which both the original baseline schedule and financing alternative become infeasible. How-ever, many previous studies on the finance-based project scheduling problem (FBSP) neglected a potential feature of stochastic activity durations. In this paper, we address the issue of generating a robust project schedule that not only satisfies financing credit and renewable resource limits, but also tackles disruptions due to activity uncertainty. A bi-objective model for finance-based and resource-constrained robust project scheduling problem (FBRCRPSP) is constructed, where the trade-off between profit and robustness is considered. Based on the transformed integer programming model, an exact procedure of & epsilon;-constraints is proposed to obtain Pareto-optimal solutions for small-sized instances. For large-scale projects, a non-dominated sorting genetic algorithm with local search (NSGA-II-LS) that deeply explores the neighboring solution space is developed, in which a generic procedure with two new recursion policies is proposed to determine the robustness of schedules. Benchmarking is conducted to evaluate the efficiency of the algorithms via some performance criteria. The re-sults show that all developed approaches have good performance in small-sized instances, and the NSGA-II-LS outperforms the non-dominated sorting genetic algorithm without local search (NSGA-II) in terms of the spread, convergence, and diversity of Pareto-optimal solutions significantly. In addition, some managerial in-sights are summarized to enlighten project managers.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Cat swarm Optimization-based schemes for resource-constrained project scheduling
    Xu, Long
    Hu, Wenbin
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
  • [42] Particle swarm optimization-based schemes for resource-constrained project scheduling
    Zhang, H
    Li, XD
    Li, H
    Huang, FL
    AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 393 - 404
  • [43] Permutation-based particle swarm optimization for resource-constrained project scheduling
    Zhang, H
    Li, H
    Tam, CM
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (02) : 141 - 149
  • [44] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Zhang, Hong
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 150 - 159
  • [45] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [46] GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities' Cost
    Liu, ZY
    Wang, HW
    ADVANCES IN INTELLIGENT COMPUTING, PT 1, PROCEEDINGS, 2005, 3644 : 937 - 946
  • [47] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Menesi, Wail
    Hegazy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [48] A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS
    Seifi, M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 347 - 360
  • [49] Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities
    Zheng, Wei-bo
    He, Yu-kang
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 239 - 243
  • [50] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293