Genetic Algorithm for Solving the No-Wait Three-Stage Surgery Scheduling Problem

被引:4
|
作者
Lin, Yang-Kuei [1 ]
Yen, Chen-Hao [1 ]
机构
[1] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 40710, Taiwan
关键词
scheduling; surgery; operating rooms; genetic algorithm; makespan; OPERATING-ROOMS;
D O I
10.3390/healthcare11050739
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
In this research, we consider a deterministic three-stage operating room surgery scheduling problem. The three successive stages are pre-surgery, surgery, and post-surgery. The no-wait constraint is considered among the three stages. Surgeries are known in advance (elective). Multiple resources are considered throughout the surgical process: PHU (preoperative holding unit) beds in the first stage, ORs (operating rooms) in the second stage, and PACU (post-anesthesia care unit) beds in the third stage. The objective is to minimize the makespan. The makespan is defined as the maximum end time of the last activity in stage 3. Minimizing the makespan not only maximizes the utilization of ORs but also improves patient satisfaction by allowing treatments to be delivered to patients in a timely manner. We proposed a genetic algorithm (GA) for solving the operating room scheduling problem. Randomly generated problem instances were tested to evaluate the performance of the proposed GA. The computational results show that overall, the GA deviated from the lower bound (LB) by 3.25% on average, and the average computation time of the GA was 10.71 s. We conclude that the GA can efficiently find near-optimal solutions to the daily three-stage operating room surgery scheduling problem.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    Liang, Yun-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (09) : 2807 - 2839
  • [32] A cooperative coevolutionary algorithm approach to the no-wait job shop scheduling problem
    Valenzuela-Alcaraz, Victor M.
    Cosio-Leon, M. A.
    Danisa Romero-Ocano, A.
    Brizuela, Carlos A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 194
  • [33] A discrete whale optimization algorithm for the no-wait flow shop scheduling problem
    Zhang, Sujun
    Gu, Xingsheng
    MEASUREMENT & CONTROL, 2023, 56 (9-10): : 1764 - 1779
  • [34] A Quantum-PSO Algorithm for No-Wait Flow shop Scheduling Problem
    Chang, Junlin
    An, Fengshuan
    Su, Pizhao
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 179 - +
  • [35] Adaptive hybrid estimation of distribution algorithm for solving a certain kind of three-stage assembly flowshop scheduling problem
    Li, Zihui
    Qian, Bin
    Hu, Rong
    Zhang, Changsheng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1829 - 1845
  • [36] A hybrid genetic local and global search algorithm for solving no-wait flow shop problem with bi criteria
    Kenan Keskin
    Orhan Engin
    SN Applied Sciences, 2021, 3
  • [37] The three-stage assembly flowshop scheduling problem
    Koulamas, C
    Kyparisis, GJ
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 689 - 704
  • [38] A hybrid genetic local and global search algorithm for solving no-wait flow shop problem with bi criteria
    Keskin, Kenan
    Engin, Orhan
    SN APPLIED SCIENCES, 2021, 3 (06):
  • [39] Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach
    Samarghandi, Hamed
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 635 - 662
  • [40] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,