Genetic Algorithm for Solving the No-Wait Three-Stage Surgery Scheduling Problem

被引:4
|
作者
Lin, Yang-Kuei [1 ]
Yen, Chen-Hao [1 ]
机构
[1] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 40710, Taiwan
关键词
scheduling; surgery; operating rooms; genetic algorithm; makespan; OPERATING-ROOMS;
D O I
10.3390/healthcare11050739
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
In this research, we consider a deterministic three-stage operating room surgery scheduling problem. The three successive stages are pre-surgery, surgery, and post-surgery. The no-wait constraint is considered among the three stages. Surgeries are known in advance (elective). Multiple resources are considered throughout the surgical process: PHU (preoperative holding unit) beds in the first stage, ORs (operating rooms) in the second stage, and PACU (post-anesthesia care unit) beds in the third stage. The objective is to minimize the makespan. The makespan is defined as the maximum end time of the last activity in stage 3. Minimizing the makespan not only maximizes the utilization of ORs but also improves patient satisfaction by allowing treatments to be delivered to patients in a timely manner. We proposed a genetic algorithm (GA) for solving the operating room scheduling problem. Randomly generated problem instances were tested to evaluate the performance of the proposed GA. The computational results show that overall, the GA deviated from the lower bound (LB) by 3.25% on average, and the average computation time of the GA was 10.71 s. We conclude that the GA can efficiently find near-optimal solutions to the daily three-stage operating room surgery scheduling problem.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Solving the no-wait job-shop problem by using genetic algorithm with automatic adjustment
    Bozejko, Wojciech
    Makuchowski, Mariusz
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 735 - 752
  • [22] Hybrid PSO-NEH algorithm for solving no-wait flexible flow shop scheduling problem
    Zhang, Qi-Liang
    Chen, Yong-Sheng
    Zhang, Q.-L., 1600, Systems Engineering Society of China (34): : 802 - 809
  • [23] A HYBRID LOCAL SEARCH ALGORITHM FOR NO-WAIT FLOWSHOP SCHEDULING PROBLEM
    Wang, Jing
    Li, Tieke
    Zhang, Wenxue
    ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, : 157 - 163
  • [24] A hybrid genetic algorithm for no-wait job shop scheduling problems
    Pan, Jason Chao-Hsien
    Huang, Han-Chiang
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 5800 - 5806
  • [25] Hybrid cross-entropy algorithm for solving complex no-wait flow-shop scheduling problem
    Zhang Z.-Q.
    Qian B.
    Hu R.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2021, 38 (12): : 1919 - 1934
  • [26] An extended teaching-learning based optimization algorithm for solving no-wait flow shop scheduling problem
    Shao, Weishi
    Pi, Dechang
    Shao, Zhongshi
    APPLIED SOFT COMPUTING, 2017, 61 : 193 - 210
  • [27] Two metaheuristics for solving no-wait operating room surgery scheduling problem under various resource constraints
    Belkhamsa, Manel
    Jarboui, Bassem
    Masmoudi, Malek
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 494 - 506
  • [28] An effective co-evolutionary quantum genetic algorithm for the no-wait flow shop scheduling problem
    Deng, Guanlong
    Wei, Ming
    Su, Qingtang
    Zhao, Mei
    ADVANCES IN MECHANICAL ENGINEERING, 2015, 7 (12):
  • [29] Discrete bat algorithm in three-stage assembly flowshop scheduling problem
    Wang Y.-L.
    Zheng J.-G.
    Wang, Yi-Lin (15800351523@163.com), 1600, Northeast University (36): : 2267 - 2278
  • [30] Comparison of scheduling efficiency in two/three-machine no-wait flow shop problem using Simulated Annealing and Genetic Algorithm
    Wang, TY
    Yang, YH
    Lin, HJ
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2006, 23 (01) : 41 - 59