Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns

被引:1
|
作者
Zambrano-Rey, Gabriel Mauricio [1 ]
Gonzalez-Neira, Eliana Maria [1 ]
Forero-Ortiz, Gabriel Fernando [1 ]
Ocampo-Monsalve, Maria Jose [1 ]
Rivera-Torres, Andrea [1 ]
机构
[1] Pontificia Univ Javeriana, Dept Ingn Ind, Carrera 7 40-62, Bogota, Colombia
关键词
Stochastic job shop scheduling; Maximum lateness; Machine breakdowns; Simheuristics; Tabu search;
D O I
10.1007/s10479-023-05592-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses a stochastic job shop scheduling problem with sequence-dependent setup times, aiming to minimize the expected maximum lateness. The stochastic nature is modeled by considering uncertain times between failures (TBF) and uncertain times to repair (TTR). To tackle this problem, a simheuristic approach is proposed, which combines a tabu search (TS) algorithm with Monte Carlo simulation. A total of 320 instances were used to conduct multiple experiments. Instances were generated with two distributions to study the behavior of stochastic TTR and TBF under log-normal and exponential distributions. Firstly, the performance of the simheuristic was evaluated for small instances by comparing it with the simulation of optimal solutions obtained with a mixed-integer linear programming (MILP) model. The simheuristic approach demonstrated an average improvement of around 7% compared to the simulation of MILP model solutions. Secondly, the simheuristic performance was evaluated for medium and large-size instances by comparing it with the simulation of the solutions obtained by the earliest due date (EDD) and process time plus work in the next queue plus negative slack (PT + WINQ + SL) dispatching rules. The results showed an average improvement of around 11% compared to EDD and 14% compared to PT + WINQ + SL. Furthermore, the results highlight that even when the two distributions have the same expected value and coefficient of variation, they can yield different expected maximum lateness values. This emphasizes the importance of precise distribution fitting when solving real cases to achieve effective scheduling performance.
引用
收藏
页码:801 / 833
页数:33
相关论文
共 50 条
  • [41] An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns
    Le Mai Thi
    Truong Tran Mai Anh
    Nguyen Van Hop
    ENGINEERING OPTIMIZATION, 2023, 55 (09) : 1535 - 1555
  • [42] Robust scheduling for minimizing maximum lateness on a serial-batch processing machine
    Wu, Wei
    Tang, Liang
    Pizzuti, Andrea
    INFORMATION PROCESSING LETTERS, 2024, 186
  • [43] A note on minimizing maximum lateness in a two-machine no-wait flowshop
    Dileepan, P
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (12) : 2111 - 2115
  • [44] Minimizing makespan for scheduling stochastic job shop with random breakdown
    Lei, De-ming
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (24) : 11851 - 11858
  • [45] Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion
    Kasperski, A
    OPERATIONS RESEARCH LETTERS, 2005, 33 (04) : 431 - 436
  • [46] MANIPULATING TABU LIST TO HANDLE MACHINE BREAKDOWNS IN JOB SHOP SCHEDULING PROBLEMS
    Nababan, Erna Budhiarti
    SalimSitompul, Opim
    PROCEEDINGS OF THE FOURTH GLOBAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION, 2011, 1337 : 224 - +
  • [47] An energy-saving distributed flexible job shop scheduling with machine breakdowns
    Zhang, Hongliang
    Qin, Chaoqun
    Xu, Gongjie
    Chen, Yi
    Gao, Zhenhua
    Applied Soft Computing, 2024, 167
  • [48] MINIMIZING MAXIMUM PENALTY IN 2-MACHINE FLOW SHOP
    TOWNSEND, W
    MANAGEMENT SCIENCE, 1977, 24 (02) : 230 - 234
  • [49] Minimizing maximum lateness on identical parallel machines with flexible resources and machine eligibility constraints
    Su, Ling-Huey
    Chang, Wei-Yi
    Chou, Fuh-Der
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1195 - 1204
  • [50] A NOTE ON MINIMIZING MAXIMUM LATENESS IN A ONE-MACHINE SEQUENCING PROBLEM WITH RELEASE DATES
    NOWICKI, E
    ZDRZALKA, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 23 (02) : 266 - 267