共 50 条
- [21] Metric Interpolation for the Problem of Minimizing the Maximum Lateness for a Single Machine Automation and Remote Control, 2021, 82 : 1706 - 1719
- [22] Robustness measurement approach of job shop scheduling with machine breakdowns Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2020, 26 (12): : 3341 - 3349
- [27] Fuzzy Resource Allocation Problem for Minimizing Maximum Lateness on a Single Machine INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2006, 5 (02): : 97 - 101