Steel wire prestress analysis of large section jacking prestressed concrete cylinder pipe (JPCCP): Site experiment and numerical investigation

被引:5
|
作者
Shen, Yi [1 ,2 ]
Ling, Jiaxin [1 ]
Lu, Xin [1 ,2 ]
Zhang, Yao [3 ]
Yan, Zhiguo [1 ,2 ]
机构
[1] Tongji Univ, Coll Civil Engn, Dept Geotech Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China
[2] Tongji Univ, State Key Lab Disaster Reduct Civil Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China
[3] Shijiazhuang Tiedao Univ, Struct Hlth Monitoring & Control Key Lab Hebei Pro, Shijiazhuang 050043, Peoples R China
关键词
JPCCP; Prestressed steel wires; Field performance; Numerical analysis; PERFORMANCE; FORCES; PREDICTION; CRACKING;
D O I
10.1016/j.tws.2022.110420
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As one of the key factors of Jacking Prestressed Concrete Cylinder Pipe (JPCCP), stress condition of the steel wire has a significant influence on the safety and durability of the JPCCP. In this paper, the stress of the steel wire was analyzed in the process based on the in-situ test monitoring results and numerical investigation in the water conveyance project in Shanghai. According to test results, the stress losses during the entire process were ruled out and turned out to be quantized. The reduction rate of steel wire was quite high in the early stage of prestress, and gradually slowed down with the time. The relaxation of steel wire was the main influencing factor of prestress loss. The numerical model of JPCCP was established and verified by field test data. Mechanical properties and failure modes of JPCCP under high inner water pressure and under different prestress losses were analyzed. After the initial prestress of steel wire was reduced from 1048 MPa to 888 MPa, the prestress of concrete in pipe core was reduced by 15%, while the compressive stress of the outer concrete was reduced by 23%. The water pressure carrying capacity of the structure was reduced by 10%. The larger the prestress loss of the steel wire was, the earlier the concrete in the pipe core entered the plastic phase. The results indicate that the prestress loss of steel wire has a direct and prominent influence on the bearing capacity of the water pressure on JPCCP. To help tunnel designers incorporate the prestress requirement into their basis of design and structural analysis, an assessment method was also proposed.
引用
收藏
页数:15
相关论文
共 17 条
  • [1] Prestressed steel wires impact on axial bearing capacity of ultra-large section jacking prestressed concrete cylinder pipe (JPCCP): Field experiment and simulation
    Zhou, Hao
    Huang, Sheng
    Ma, Baosong
    Zhao, Yahong
    Tan, Xuhong
    Zhang, Haifeng
    ENGINEERING FAILURE ANALYSIS, 2025, 167
  • [2] Full-scale test study on the mechanical response of ultra-large section jacking prestressed concrete cylinder pipe (JPCCP) under axial jacking force
    Zhou, Hao
    Huang, Sheng
    Ma, Baosong
    Zhang, Haifeng
    Tan, Xuhong
    Zhao, Yahong
    Ma, Peng
    Su, Xinhui
    Wei, Yingjie
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [3] Numerical simulation analysis of prestressed concrete cylinder pipe
    Zhang, She-Rong
    Zhang, Cai-Xiu
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2009, 41 (08): : 118 - 122
  • [4] NUMERICAL INVESTIGATION IN DETECTION OF PRESTRESS LOSSES IN PRESTRESSED CONCRETE SLAB BY MODAL ANALYSIS
    Kovalovs, Andrejs
    Akishin, Pavel
    Ruchevskis, Sandris
    17TH INTERNATIONAL SCIENTIFIC CONFERENCE: ENGINEERING FOR RURAL DEVELOPMENT, 2018, : 1407 - 1412
  • [5] Numerical Investigation on Detection of Prestress Losses in a Prestressed Concrete Slab by Modal Analysis
    Kovalovs, A.
    Rucevskis, S.
    Akishin, P.
    Kolupajevs, J.
    3RD INTERNATIONAL CONFERENCE ON INNOVATIVE MATERIALS, STRUCTURES AND TECHNOLOGIES (IMST 2017), 2017, 251
  • [6] Mechanical capacity analysis of large diameter prestressed concrete cylinder pipe(PCCP)
    Wang, Yuliang
    Bi, Yongqing
    Zhou, Xiaojie
    PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 3214 - 3219
  • [7] Full-scale experiment and numerical simulation of prestressed concrete cylinder pipe with broken wires strengthened by prestressed CFRP
    Zhai, Kejie
    Fang, Hongyuan
    Guo, Chengchao
    Ni, Pengpeng
    Wu, Hanying
    Wang, Fuming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [8] Rehabilitation of large diameter prestressed cylinder concrete pipe (PCCP) with FRP composites - Experimental investigation
    Lee, DC
    Karbhari, VM
    ADVANCES IN STRUCTURAL ENGINEERING, 2005, 8 (01) : 31 - 44
  • [9] Use of numerical methods for identifying the number of wire breaks in prestressed concrete cylinder pipe by piezoelectric sensing technology
    Wang, Xu
    Hu, Shaowei
    Li, Wenhao
    Qi, Hao
    Xue, Xiang
    CONSTRUCTION AND BUILDING MATERIALS, 2021, 268
  • [10] Numerical Analysis on Large-Section Pipe Jacking within Close Distance in Soft Soil
    Xie, Xiaoli
    Ye, Bin
    IFCEE 2021: EARTH RETENTION, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2021, 324 : 156 - 165