Prestressed steel wires impact on axial bearing capacity of ultra-large section jacking prestressed concrete cylinder pipe (JPCCP): Field experiment and simulation

被引:1
|
作者
Zhou, Hao [1 ,2 ]
Huang, Sheng [1 ,2 ,3 ]
Ma, Baosong [1 ,2 ,3 ]
Zhao, Yahong [1 ,2 ]
Tan, Xuhong [1 ,2 ]
Zhang, Haifeng [4 ]
机构
[1] Sun Yat sen Univ, Sch Civil Engn, Guangzhou 510275, Peoples R China
[2] Southern Marine Sci & Engn Guangdong Lab, Zhuhai 519082, Peoples R China
[3] State Key Lab Tunnel Engn, Guangzhou 510275, Peoples R China
[4] Tianjin Univ, Sch Precis Instrument & Optoelect Engn, State Key Lab Precis Measurement Technol & Instrum, Tianjin 300072, Peoples R China
关键词
JPCCP; Prestressed steel wires; Field experiment; Numerical simulation; Failure risk assessment; PERFORMANCE;
D O I
10.1016/j.engfailanal.2024.109046
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Jacking prestressed concrete cylinder pipe (JPCCP) represents an innovative composite structure for pipe jacking applications. As a critical component of the JPCCP, the stress levels and stress loss of the prestressed steel wires significantly influence the axial bearing capacity during the jacking process, subsequently impacting the long-term safety and durability of the pipeline. This study presents a field loading experiment conducted with China's largest JPCCP project. The results reveal tension and relaxation phenomena in the prestressed wires at various positions throughout the jacking process, and the wires' deformation in the pipe's central section was greater than that at the bell-spigot end. Following the initial jacking, the stress loss of the prestressed wires was the highest, with significantly reduced deformation in subsequent jacking stages, culminating in a maximum stress loss of 29.0 MPa. Utilizing ABAQUS, a numerical model of the JPCCP incorporating multiple interlayer relationships was developed and validated against experiment data. The study further analyzes the effects of steel wire spacing, prestress level, and prestress loss across different concrete layers, and examines the damage to key areas of the pipe under ultimate compression jacking. The findings indicate that the inner concrete at the spigot end is more prone to damage and yielding, predominantly due to cross-sectional mutations, additional bending moments, and tensile stresses. Based on these findings, specific design and construction proposals are proposed. This study provides an in-depth analysis of the impact of prestressed steel wires on the axial bearing capacity of ultra-large section JPCCP, offering valuable insights into its design and construction.
引用
收藏
页数:22
相关论文
共 5 条
  • [1] Full-scale test study on the mechanical response of ultra-large section jacking prestressed concrete cylinder pipe (JPCCP) under axial jacking force
    Zhou, Hao
    Huang, Sheng
    Ma, Baosong
    Zhang, Haifeng
    Tan, Xuhong
    Zhao, Yahong
    Ma, Peng
    Su, Xinhui
    Wei, Yingjie
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [2] Steel wire prestress analysis of large section jacking prestressed concrete cylinder pipe (JPCCP): Site experiment and numerical investigation
    Shen, Yi
    Ling, Jiaxin
    Lu, Xin
    Zhang, Yao
    Yan, Zhiguo
    THIN-WALLED STRUCTURES, 2023, 184
  • [3] Full-scale experiment and numerical simulation of prestressed concrete cylinder pipe with broken wires strengthened by prestressed CFRP
    Zhai, Kejie
    Fang, Hongyuan
    Guo, Chengchao
    Ni, Pengpeng
    Wu, Hanying
    Wang, Fuming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [4] Full-Scale Test and Bearing Capacity Evaluation of Large Diameter Prestressed Concrete Cylinder Pipe under Internal Water Pressure
    Qu, Fulai
    Zhang, Di
    Shang, Pengran
    Wang, Hao
    Zheng, Wenkui
    Zhao, Shunbo
    BUILDINGS, 2022, 12 (11)
  • [5] Full-scale test and numerical simulation study on load-carrying capacity of prestressed concrete cylinder pipe (PCCP) with broken wires under internal water pressure
    Hu, Benyue
    Fang, Hongyuan
    Wang, Fuming
    Zhai, Kejie
    ENGINEERING FAILURE ANALYSIS, 2019, 104 : 513 - 530