Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants

被引:5
|
作者
Trach, Roman [1 ,2 ]
Khomenko, Oleksandr [3 ]
Trach, Yuliia [1 ,2 ]
Kulikov, Oleksii [4 ]
Druzhynin, Maksym [3 ]
Kishchak, Nataliia [3 ]
Ryzhakova, Galyna [3 ]
Petrenko, Hanna [3 ]
Prykhodko, Dmytro [3 ]
Obodianska, Olha [5 ]
机构
[1] Warsaw Univ Life Sci, Inst Civil Engn, PL-02776 Warsaw, Poland
[2] Natl Univ Water & Environm Engn, Inst Civil Engn & Architecture, UA-33028 Rivne, Ukraine
[3] Kyiv Natl Univ Construct & Architecture, Dept Management Construct, UA-03037 Kiev, Ukraine
[4] State Univ Trade & Econ, Dept Int Civil & Commercial Law, UA-02156 Kiev, Ukraine
[5] Kyiv Natl Univ Construct & Architecture, Dept Construct & Informat Technol, UA-03037 Kiev, Ukraine
关键词
centrality measures; communication; construction projects; social network analysis; fuzzy logic; SELF-ORGANIZING NETWORKS; TEAM; CENTRALITY; IMPACT; PERFORMANCE; SYSTEMS;
D O I
10.3390/su15075653
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The purpose of this research is to study the communication network among the participants in a construction project. The proposed approach contains the solving of the following tasks: identification of the key factors that affect the communication quality; calculation of the "communication quality" indicator between each pair of participants using fuzzy logic; and evaluation of the key measures of centrality using the tools of a Social Network Analysis. Solving the set tasks can help break the problem of the low level of efficiency of construction project deliveries. This study was conducted when the design stage was already complete and the construction project had 17 participants. We used the following factors influencing communication quality: timeliness, understanding, bidirectionality, use of IT tools in communication acts and adequacy. The use of fuzzy logic tools can minimise the subjectivity of the qualitative data obtained from the questionnaires. The analysis of five centrality measures showed that "Project manager", "Chief engineer", "Construction site manager", "Construction works manager" and "Architect" had the greatest values in comparison with other network participants. On the one hand, this organisational structure of communication can be considered correct because the main information flows through the project managers, who make the decisions. On the other hand, this indicates a significant dependence of the construction project on these participants and, in the event of certain risk events, may lead to a decrease in the efficiency of its implementation. The methods presented in this article can be used in project management to analyse a real communication network.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Planning and monitoring communication between construction project participants
    Kania, E.
    Sladowski, G.
    Radziszewska-Zielina, E.
    Sroka, B.
    Szewczyk, B.
    ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (02) : 455 - 473
  • [2] Integration of fuzzy logic, particle swarm optimization and neural networks in quality assessment of construction project
    Shi H.
    Li W.
    Journal of Software, 2010, 5 (07) : 737 - 744
  • [3] Centrality of a communication network of construction project participants and implications for improved project communication
    Trach, Roman
    Lendo-Siwicka, Marzena
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2021, 38 (02) : 145 - 160
  • [4] Assessment of the effectiveness of communication between the participants of a construction project utilizing meta-network theory: a case study
    Kania, Ewelina
    Sladowski, Grzegorz
    Radziszewska-Zielina, Elzbieta
    Sroka, Bartlomiej
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 307 - 327
  • [5] Analysis of the impact of communication between the participants of a construction project on its completion time and cost
    Kania, Ewelina
    Sladowski, Grzegorz
    Radziszewska-Zielina, Elzbieta
    Sroka, Bartlomiej
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (01) : 595 - 610
  • [6] ANALYSIS OF SELF-ORGANISING NETWORKS OF COMMUNICATION BETWEEN THE PARTICIPANTS OF A HOUSING COMPLEX CONSTRUCTION PROJECT
    Sladowski, G.
    Radziszewska-Zielina, E.
    Kania, E.
    ARCHIVES OF CIVIL ENGINEERING, 2019, 65 (01) : 181 - 195
  • [7] MANAGING INFORMATION FLOW IN SELF-ORGANISING NETWORKS OF COMMUNICATION BETWEEN CONSTRUCTION PROJECT PARTICIPANTS
    Radziszewska-Zielina, E.
    Sladowski, G.
    Kania, E.
    Sroka, B.
    Szewczyk, B.
    ARCHIVES OF CIVIL ENGINEERING, 2019, 65 (02) : 133 - 148
  • [8] Application of fuzzy logic to simulation for construction operations
    Zhang, H
    Tam, CM
    Shi, JJS
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2003, 17 (01) : 38 - 45
  • [9] Application of a fuzzy based decision making methodology to construction project risk assessment
    Zeng, Jiahao
    An, Min
    Smith, Nigel John
    International Journal of Project Management, 2007, 25 (06) : 589 - 600
  • [10] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE
    Soni, Akash
    Kumar, Ramesh
    Shrivastava, Amit
    ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395