Estimating Service Life of Prestressed Concrete Systems Exposed to Chlorides

被引:0
|
作者
Joseline, Dyana [1 ]
Pillai, Radhakrishna G. [1 ]
机构
[1] Indian Inst Technol Madras, Chennai, Tamil Nadu, India
关键词
Prestressed concrete; Corrosion; Service life-based design; Corrosion assessment;
D O I
10.1007/978-3-031-21735-7_31
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In general, pretensioned concrete (PTC) structures are being designed with a target service life of about 100 years. However, cases of premature/catastrophic corrosion-induced strand failures have been reported. This necessitates a re-examination of the current practices for service life-based design (SLD) as well as corrosion assessment of new and existing PTC structures respectively, especially the choice of limit states and the parameters considered. The work presented in this paper is a component of the research carried out to develop tools to assist SLD and assessment of PTC structures, and focusses on the estimation of time required for Passive-to-Active (P-to-A) transition, which is the first step of chloride-induced corrosion of prestressed steel strands. For this, ordinary Portland cement-based reinforced mortar specimens (both unstressed and stressed categories) were prepared using prestressing (PS) steel king wires extracted from 7-wire strands. Totally, 10 specimens (5 + 5) were cast, cured for 28 days and then subjected to dry-wet (5-day drying followed by 2-day wetting) cycles in simulated concrete pore solution containing sodium chloride. The P-to-A transition was detected by continuous monitoring of the open circuit potential and impedance measurements at the end of every wet exposure period. The specimens were then autopsied and the concentration of chlorides in the mortar at the level of steel was determined and defined as Clth. It was found that the Clth of PS steel can reduce by half in OPC system when prestress is applied. A case study was performed to understand the implications of using overestimated values of Clth on the service life. An overestimation in service life of about 40% was observed when the Clth of unstressed PS steel was used - emphasizing the importance of determining the Clth of stressed steel and using it for service life estimation.
引用
收藏
页码:280 / 288
页数:9
相关论文
共 50 条
  • [21] Bond model for prestressed strands in fire exposed concrete
    Fellinger, JHH
    Stark, JWB
    Walraven, JC
    HIGH PERFORMANCE MATERIALS IN BRIDGES, 2003, : 21 - 33
  • [22] Service Life Prediction of Precast Concrete Structures Exposed to Chloride Environment
    Zhang, Dawei
    Zeng, Yu
    Fang, Mingshan
    Jin, Weiliang
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [24] Performance of Prestressed Concrete Bridge Girders Exposed to Fire
    Zhang, Gang
    Kodur, Venkatesh K. R.
    Wang, Cuijuan
    He, Shuanhai
    RESPONSE OF STRUCTURES UNDER EXTREME LOADING, 2015, : 890 - 899
  • [25] Evaluation of probabilistic and deterministic life-cycle cost analyses for concrete bridges exposed to chlorides
    Cadenazzi, T.
    Lee, H.
    Suraneni, P.
    Nolan, S.
    Nanni, A.
    CLEANER ENGINEERING AND TECHNOLOGY, 2021, 4
  • [26] Effect of coupled deterioration by freeze-thaw, carbonation and chlorides on concrete service life
    Kuosa, H.
    Ferreira, R. M.
    Holt, E.
    Leivo, M.
    Vesikari, E.
    CEMENT & CONCRETE COMPOSITES, 2014, 47 : 32 - 40
  • [27] MEDLEY OF PRECAST AND PRESTRESSED CONCRETE SYSTEMS
    DUNBAR, NF
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (02): : 78 - 86
  • [28] ESTIMATING SERVICE LIFE
    不详
    MACHINE DESIGN, 1969, 41 (12) : 136 - &
  • [29] Service life of prestressed high-strength concrete pile in marine environment considering effects of concrete stratification and temperature
    Li, Lin
    Gong, Weibing
    Li, Jingpei
    CONSTRUCTION AND BUILDING MATERIALS, 2020, 253
  • [30] Special SNCF Regulations for Ensuring the Long Service Life of Railway Prestressed Concrete Structures.
    Borderie, Paul