Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times

被引:4
|
作者
Sarac, Tugba [1 ]
Ozcelik, Feristah [1 ]
Ertem, Mehmet [1 ]
机构
[1] Eskisehir Osmangazi Univ, Eskisehir, Turkiye
关键词
Unrelated parallel machine scheduling problem; Two-stage stochastic programming; Stochastic sequence-dependent setup times; Genetic algorithm (GA); DUE-DATE ASSIGNMENT; SINGLE-MACHINE; FLOWSHOP; TARDINESS; ALGORITHM; MINIMIZE; RISK; JOBS;
D O I
10.1007/s12351-023-00789-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Unrelated parallel machine scheduling problem (UPM) is widely studied in the scheduling literature because of its extensive application area in the industry. Since it has a stochastic nature, several studies handled the problem as stochastic. However, most of the studies that have considered the problem as stochastic focused only on the case of stochastic processing times. Whereas, especially in industries where setup times are sequence and machine-dependent, these are often stochastic, as well. Although this situation has been ignored in the literature for a long time, it has been examined only in a few studies. In this study, for the first time, an exact solution method is proposed to solve UPM with stochastic sequence-dependent setup times (SDSTs). For the considered problem, a two-stage stochastic programming method is proposed. A mathematical model and a genetic algorithm are developed for the stochastic problem. The effectiveness of the proposed solution approaches is demonstrated using randomly generated test problems. The test results demonstrate the importance of considering the SDSTs as stochastic.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times
    Yunusoglu, Pinar
    Yildiz, Seyda Topaloglu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (07) : 2212 - 2229
  • [32] An Adaptive Clonal Selection Algorithm with Stage Mutation Operation for Unrelated Parallel Machine Scheduling Problem with Sequence-dependent Setup Times
    Niu, Qun
    Zhou, Fang
    Zhou, Taijin
    MATERIALS, MECHATRONICS AND AUTOMATION, PTS 1-3, 2011, 467-469 : 1967 - 1972
  • [33] Integrated Working-Age Maintenance to the Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times
    Gao, Jia
    Wang, Yanhong
    Zhang, Jun
    Tan, Yuanyuan
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2024,
  • [34] Hybrid meta-heuristics for the unrelated parallel machine scheduling problem with setup times
    Fang, Wei
    Zhu, Haolin
    Mei, Yi
    KNOWLEDGE-BASED SYSTEMS, 2022, 241
  • [35] Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times
    Perez-Gonzalez, Paz
    Fernandez-Viagas, Victor
    Zamora Garcia, Miguel
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 : 131 - 145
  • [36] GARP: A New Genetic Algorithm for the Unrelated Parallel Machine Scheduling Problem with Setup Times
    Haddad, Matheus N.
    Coelho, Igor M.
    Ochi, Luiz S.
    Souza, Marcone J. F.
    Santos, Haroldo G.
    Martins, Alexandre X.
    2012 31ST INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC 2012), 2012, : 152 - 160
  • [37] GRASP algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources
    Yepes-Borrero, Juan C.
    Villa, Fulgencia
    Perea, Federico
    Pablo Caballero-Villalobos, Juan
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 141
  • [38] Robust Optimization on Unrelated Parallel Machine Scheduling With Setup Times
    Wang, Weihao
    Gao, Chutong
    Shi, Leyuan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (01) : 346 - 360
  • [39] A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect
    Zhang, Like
    Deng, Qianwang
    Lin, Ruihang
    Gong, Guiliang
    Han, Wenwu
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 175
  • [40] A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server
    Bektur, Gulcin
    Sarac, Tugba
    COMPUTERS & OPERATIONS RESEARCH, 2019, 103 : 46 - 63