共 50 条
- [1] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2009, 43 : 161 - 169
- [2] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 161 - 169
- [3] Scheduling unrelated parallel machines with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
- [4] Scheduling unrelated parallel machines with sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
- [7] A GENETIC ALGORITHM FOR THE UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH JOB SPLITTING AND SEQUENCE-DEPENDENT SETUP TIMES - LOOM SCHEDULING [J]. TEKSTIL VE KONFEKSIYON, 2014, 24 (01): : 66 - 73
- [8] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
- [9] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 777 - 794
- [10] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance [J]. 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378