Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt

被引:3
|
作者
Raghib, A. T. [1 ]
Belayutham, S. [1 ]
Mohammad, M. Z. [1 ]
Ibrahim, C. K. I. C. [1 ]
机构
[1] Univ Teknol MARA, Coll Engn, Sch Civil Engn, Shah Alam, Malaysia
关键词
Cost deviation; cause and effect; measures; high-rise building; construction project; Egypt; OVERRUNS; RISK;
D O I
10.1080/15623599.2021.2021464
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost deviation is a global issue that has negative impacts on projects, stakeholders and the industry. Egypt, a developing nation with the rising demand for high-rise buildings is also plagued with the issue. It is inevitable that high-rise buildings cost more than low-rise buildings, further accentuating the needs to study cost deviation from all angles, which was previously absent. Therefore, this study aims to provide an overall perspective (causes, effects and measures) of cost deviation in high-rise building projects in Egypt by adopting both quantitative (questionnaire survey) and qualitative (brain storming sessions) approaches. The questionnaire survey has been administered among various construction practitioners (project manager, consultant, quantity surveyor, site engineer) with experiences in high-rise building projects, while the brainstorming session involved expert panels from the industry. Findings from the 106 questionnaires have revealed inflation as the major cause of cost deviation that has the most effect on profit loss for the contractor. Government and project-based measures with great collaboration has been proposed to address the issue. The overall perspective (causes, effects, measures) provided in this study would be of interest to the local construction stakeholders, as well as foreign investors towards improving the cost performance of high-rise building projects in Egypt.
引用
收藏
页码:1875 / 1885
页数:11
相关论文
共 50 条
  • [1] The cost of implementing OHSMS regulation on high-rise building projects
    Wirahadikusumah, Reini D.
    Adhiwira, Felix
    2ND CONFERENCE FOR CIVIL ENGINEERING RESEARCH NETWORKS (CONCERN-2 2018), 2019, 270
  • [2] Assessment of Risk Factors to Cost and Schedule in High-Rise Building Projects
    Bardakci, Gunes
    CTBUH Journal, 2020, 2020 (03) : 28 - 35
  • [3] Identifying causes for waste factors in high-rise building projects: A survey in Vietnam
    Ha Duy Khanh
    Kim, Soo Yong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (04) : 865 - 874
  • [4] Identifying causes for waste factors in high-rise building projects: A survey in Vietnam
    Ha Duy Khanh
    Soo Yong Kim
    KSCE Journal of Civil Engineering, 2014, 18 : 865 - 874
  • [5] Effective control measures to minimize cost overrun during construction phase of high-rise residential building projects in Chongqing, China
    Wang, Yue
    Ghazali, Farid Ezanee Mohamed
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (03) : 79 - 94
  • [6] Causes and Control Measures of Mass Concrete Crack of High-Rise Building Basement Foundation Slab
    Feng, Huihong
    Wang, Xi
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 1609 - +
  • [7] Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang
    Haslinda, A. Nor
    Xian, T. Wei
    Norfarahayu, K.
    Hanafi, R. Muhamad
    Fikri, H. Muhammad
    INTERNATIONAL SEMINAR ON MATHEMATICS AND PHYSICS IN SCIENCES AND TECHNOLOGY 2017 (ISMAP 2017), 2018, 995
  • [8] Mitigating delays in high-rise building projects: The case of Dubai
    Kandil, Sameh
    Skaik, Samer
    PROJECT MANAGEMENT RESEARCH AND PRACTICE, 2020, 6
  • [9] Energy saving potential for a high-rise office building
    Bagci, Baris
    INTELLIGENT BUILDINGS INTERNATIONAL, 2009, 1 (02) : 156 - 163
  • [10] Effects of stacked condensers in a high-rise apartment building
    Choi, SH
    Lee, KS
    Kim, BS
    ENERGY, 2005, 30 (07) : 968 - 981