Identifying causes for waste factors in high-rise building projects: A survey in Vietnam

被引:0
|
作者
Ha Duy Khanh
Soo Yong Kim
机构
[1] Ho Chi Minh City University of Technical Education,Dept. of Civil Engineering and Applied Mechanics
[2] Pukyong National University,Dept. of Civil Engineering
来源
关键词
lean construction; workflow; waste factor; high-rise building; vietnam;
D O I
暂无
中图分类号
学科分类号
摘要
A lot of non value-adding activities are existing in construction practices. Most of them were left unnoticed or unattended during construction. Previous studies have shown that significant amounts of project values were lost due to these problems. This paper was conducted based on the basis of waste concepts in construction under the philosophies of lean production. A survey was carried out through questionnaire, which was answered by experts and experienced people in high-rise building projects. The results showed that the relationship of waste recognition with its control ability was low with 0.461, 0.695 and 0.701 for contributory time waste, direct conversion waste and non-contributory time waste, respectively. The test on inter-relationship between recognition, control and frequency of waste signified that there was only one case that has negative relationship (r = −0.236) for contributory time waste. The trend of connecting the waste factors to their cause was carried out by a cause-and-effect matrix. The most dominant cause for all waste factors belongs to people cause with 52.6%, and the most unlikely cause belongs to information/communication cause with 0%. This paper then proposed some courses of action to reduce or eliminate level of waste based on expert survey.
引用
收藏
页码:865 / 874
页数:9
相关论文
共 50 条
  • [1] Identifying causes for waste factors in high-rise building projects: A survey in Vietnam
    Ha Duy Khanh
    Kim, Soo Yong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (04) : 865 - 874
  • [2] Assessment of Risk Factors to Cost and Schedule in High-Rise Building Projects
    Bardakci, Gunes
    CTBUH Journal, 2020, 2020 (03) : 28 - 35
  • [3] Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt
    Raghib, A. T.
    Belayutham, S.
    Mohammad, M. Z.
    Ibrahim, C. K. I. C.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1875 - 1885
  • [4] Accidental safety factors and prevention techniques for high-rise building projects - A review
    Manzoor, Bilal
    Othman, Idris
    Waheed, Abdul
    AIN SHAMS ENGINEERING JOURNAL, 2022, 13 (05)
  • [5] Evaluating the critical safety factors causing accidents in high-rise building projects
    Manzoor, Bilal
    Othman, Idris
    Manzoor, Muneeb
    AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (03) : 2485 - 2492
  • [6] Factors influencing temporary wood waste generation in high-rise building construction
    Kern, Andrea Parisi
    Amor, Luciano Vargas
    Angulo, Sergio Cirelli
    Montelongo, Alfredo
    WASTE MANAGEMENT, 2018, 78 : 446 - 455
  • [7] Identifying and evaluating causes of waste effect in green building projects
    Usama Hamed Issa
    Ahmed Gamal AbdelHaffez
    Alaa Atif Abdel-Hafez
    Kamal Abbas Assaf
    Journal of Engineering and Applied Science, 2025, 72 (1):
  • [8] Critical Success Factors for Safety Management of High-Rise Building Construction Projects in China
    Li, Yadi
    Ning, Yan
    Chen, Wei Tong
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [9] Mitigating delays in high-rise building projects: The case of Dubai
    Kandil, Sameh
    Skaik, Samer
    PROJECT MANAGEMENT RESEARCH AND PRACTICE, 2020, 6
  • [10] The cost of implementing OHSMS regulation on high-rise building projects
    Wirahadikusumah, Reini D.
    Adhiwira, Felix
    2ND CONFERENCE FOR CIVIL ENGINEERING RESEARCH NETWORKS (CONCERN-2 2018), 2019, 270