Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt

被引:3
|
作者
Raghib, A. T. [1 ]
Belayutham, S. [1 ]
Mohammad, M. Z. [1 ]
Ibrahim, C. K. I. C. [1 ]
机构
[1] Univ Teknol MARA, Coll Engn, Sch Civil Engn, Shah Alam, Malaysia
关键词
Cost deviation; cause and effect; measures; high-rise building; construction project; Egypt; OVERRUNS; RISK;
D O I
10.1080/15623599.2021.2021464
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost deviation is a global issue that has negative impacts on projects, stakeholders and the industry. Egypt, a developing nation with the rising demand for high-rise buildings is also plagued with the issue. It is inevitable that high-rise buildings cost more than low-rise buildings, further accentuating the needs to study cost deviation from all angles, which was previously absent. Therefore, this study aims to provide an overall perspective (causes, effects and measures) of cost deviation in high-rise building projects in Egypt by adopting both quantitative (questionnaire survey) and qualitative (brain storming sessions) approaches. The questionnaire survey has been administered among various construction practitioners (project manager, consultant, quantity surveyor, site engineer) with experiences in high-rise building projects, while the brainstorming session involved expert panels from the industry. Findings from the 106 questionnaires have revealed inflation as the major cause of cost deviation that has the most effect on profit loss for the contractor. Government and project-based measures with great collaboration has been proposed to address the issue. The overall perspective (causes, effects, measures) provided in this study would be of interest to the local construction stakeholders, as well as foreign investors towards improving the cost performance of high-rise building projects in Egypt.
引用
收藏
页码:1875 / 1885
页数:11
相关论文
共 50 条
  • [11] Aeroelastic and aerodynamic interference effects on a high-rise building
    Huang Dongmei
    Zhu Ledong
    Ding Quanshun
    Zhu Xue
    Chen Wei
    JOURNAL OF FLUIDS AND STRUCTURES, 2017, 69 : 355 - 381
  • [12] High-Rise Building Fires
    Kohno, Mamoru
    JOURNAL OF DISASTER RESEARCH, 2007, 2 (04) : 236 - 249
  • [13] A high-rise building fire
    Craighead, G
    FOURTH CONFERENCE ON TALL BUILDINGS IN SEISMIC REGIONS, PROCEEDINGS: TALL BUILDINGS FOR THE 21ST CENTURY, 1997, : 427 - 428
  • [14] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [15] Assessment Model of Interactions Required in Design Teams in High-Rise Building Projects
    Herrera, Rodrigo F.
    Galaz-Delgado, Eduardo I.
    Atencio, Edison
    Munoz-La Rivera, Felipe
    Castillo, Tito
    MATHEMATICS, 2023, 11 (14)
  • [16] Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects
    Yang, Yi
    Pan, Mi
    Pan, Wei
    Zhang, Zhiqian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (03)
  • [17] Overcoming process-related barriers in modular high-rise building projects
    van der Ham, Mark
    Opdenakker, Raymond
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (10) : 1779 - 1789
  • [18] Evaluating the critical safety factors causing accidents in high-rise building projects
    Manzoor, Bilal
    Othman, Idris
    Manzoor, Muneeb
    AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (03) : 2485 - 2492
  • [19] Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects
    Yang, Yi
    Pan, Mi
    Pan, Wei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [20] Accidental safety factors and prevention techniques for high-rise building projects - A review
    Manzoor, Bilal
    Othman, Idris
    Waheed, Abdul
    AIN SHAMS ENGINEERING JOURNAL, 2022, 13 (05)