A case study on design and construction of mined tunnel in challenging ground conditions in Singapore

被引:0
|
作者
Jinrong, Y. [1 ]
Claudia, M. [1 ]
Sharique, K. [2 ]
Venkatesh, G. [3 ]
机构
[1] COWI Singapore Pte Ltd, Singapore, Singapore
[2] COWI India Ltd, Gurugram, India
[3] Leighton Contractors Asia Ltd, Singapore Branch, Singapore, Singapore
关键词
D O I
10.1201/9781003348030-238
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a case study on design and construction of mined tunnel for DTSS2 in Singapore. The geological condition comprises excavation in soft soil, hard rock as well as unexpected fault zone with high water permeability. The analysis methods for mined tunnel in rock used included the Q-system, analytical closed-form calculations, kinematic analysis using the Unwedge software, while the analysis method for mined tunnel in soil was carried out using finite element method with ground stress relaxation assessment. Mechanical excavation with hydraulic breakers and excavators were adopted for construction of the mined tunnel. Probe drilling and grouting were carried out to form a water-tight zone surrounding the tunnel profile. Convergence points were installed and monitored to ensure the movement of the mined tunnel is within design limit. The excavation of the mined tunnel has completed in March 2022, the maximum convergence of mined tunnel recorded was well within the design work suspension level.
引用
收藏
页码:1979 / 1987
页数:9
相关论文
共 50 条
  • [1] Tunnelling through challenging ground conditions in Singapore
    Knight-Hassell, CK
    Tan, KB
    TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 633 - 638
  • [2] Paierdorf ventilation facility - Design and construction of a complex structure in challenging ground conditions
    Das Lüftungsbauwerk Paierdorf - Planung und herstellung eines komplexen untertagebauwerks in anspruchsvollen gebirgsverhältnissen
    2013, Ernst und Sohn (06):
  • [3] Design and Analysis of Shotcrete Lining in Tunnels Under Squeezing Ground Conditions: A Case Study of Atal Tunnel
    Lohar, Geetanjali K.
    Kumar, Ankesh
    Roy, Nishant
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (08) : 6857 - 6888
  • [4] Chenani-Nashri Tunnel, the longest road tunnel in India: a challenging case for design-optimization during construction
    Palomba, M.
    Russo, G.
    Amadini, F.
    Carrieri, G.
    Jain, A. R.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 964 - 971
  • [5] DOUBLE SHIELD TBM IN CHALLENGING, DIFFICULT GROUND CONDITIONS-A CASE STUDY FROM ZAGROS LONG WATER TRANSFER TUNNEL, IRAN
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rostami, Jamal
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1321 - +
  • [6] Ground stabilization for tunnel construction in mixed-face conditions
    Darrag, AA
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (03) : 319 - 326
  • [7] Monitoring and Evaluation of Artificial Ground Freezing in Metro Tunnel Construction-A Case Study
    Yan, Qixiang
    Wu, Wang
    Zhang, Chuan
    Ma, Shuqi
    Li, Yuanping
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (05) : 2359 - 2370
  • [8] Monitoring and Evaluation of Artificial Ground Freezing in Metro Tunnel Construction-A Case Study
    Qixiang Yan
    Wang Wu
    Chuan Zhang
    Shuqi Ma
    Yuanping Li
    KSCE Journal of Civil Engineering, 2019, 23 : 2359 - 2370
  • [9] Design and construction of a sewer tunnel in difficult site conditions
    Croce, P.
    Di Maio, S.
    Speciale, G.
    Cassibba, L.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 157 - 164
  • [10] Ground and tunnel deformation induced by excavation in pipe-roof pre-construction tunnel: A case study
    Yang, Songsong
    Zhang, Dingwen
    Wang, Mei
    Li, Jiyang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 131