Strategies for LEED-NC-Certified Projects in Germany and Results of Their Life Cycle Assessment

被引:3
|
作者
Pushkar, Svetlana [1 ]
机构
[1] Ariel Univ, Dept Civil Engn, IL-40700 Ariel, Israel
关键词
LEED-NC; certification strategy; life cycle assessment; office space projects; Germany; STATISTICS; EMISSIONS; TESTS;
D O I
10.3390/buildings13081970
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The aim of this study was to investigate strategies for the certification of environmentally friendly office buildings in Germany. A total of 39 LEED-NC gold-certified office space projects were ranked according to their "optimize energy performance" credit (EAc1) achievements from the energy and atmosphere (EA) category and divided into two groups: 13 projects (group 1) with the highest and 13 projects (group 2) with the lowest EAc1 achievements. Nonparametric statistics were used to evaluate the differences between groups 1 and 2. A two-stage nested analysis of variance test was used to evaluate the differences between the two groups in terms of their life cycle assessment (LCA). A comparison of the two groups showed that group 1 outperformed group 2 in the EA category (p < 0.0001). However, in the other LEED categories, the differences between the two groups were not significant (p = 0.0761). As a result, group 1 outperformed group 2 in terms of overall LEED points (p = 0.0048). The LCA of EAc1 showed that group 1 enacted the lowest environmental damage when compared to group 2 (p = 0.0040). The environmental assessment of LEED-certified projects can help green building managers choose the most sustainable certification strategy.
引用
下载
收藏
页数:19
相关论文
共 50 条
  • [41] Life Cycle Assessment of Construction and Demolition Waste from Railway Engineering Projects
    Huang, Jianling
    Yin, Yang
    Zheng, Lei
    Zhang, Sibo
    Zhao, Qingyun
    Chen, Huihua
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [42] Social life cycle assessment of biomass projects focusing on employment changes in regions
    Heiho, Aya
    Hondo, Hiroki
    Moriizumi, Yue
    Nihon Enerugi Gakkaishi/Journal of the Japan Institute of Energy, 2015, 94 (02): : 159 - 169
  • [43] Application Research of BIM in Environment Assessment of Full Life Cycle for Construction Projects
    Wang Huali
    2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 652 - 655
  • [44] Life cycle assessment in housing projects: an applied study for the context of Northeast Brazil
    Tabosa, R. M. R.
    Silva, G. J. A.
    SUSTAINABLE DEVELOPMENT AND PLANNING VIII, 2017, 210 : 171 - 182
  • [45] Life Cycle Sustainability Assessment: An Index System for Building Energy Retrofit Projects
    Song, Pei
    Wu, Lingyu
    Zhao, Wenbo
    Ma, Wenting
    Hao, Jianli
    Buildings, 2024, 14 (09)
  • [46] Comprehensive assessment on the life-cycle environment impact of railway construction projects
    Wu Wenjie
    Wang Zhonghao
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1467 - 1471
  • [47] Life Cycle Assessment in environmental impact assessments of industrial projects: towards the improvement
    Zidoniene, Sigita
    Kruopiene, Jolita
    JOURNAL OF CLEANER PRODUCTION, 2015, 106 : 533 - 540
  • [48] RISK ASSESSMENT ACROSS LIFE CYCLE PHASES FOR SMALL AND MEDIUM SOFTWARE PROJECTS
    Bilal, Muhammad
    Gani, Abdullah
    Liaqat, Misbah
    Bashir, Nauman
    Malik, Nadia
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2020, 15 (01): : 572 - 588
  • [49] Life cycle assessment and life cycle costing analysis for uncertified and Malaysia sustainable palm oil- MSPO-certified independent smallholders
    Bok, Chia Hoi
    Lim, Chun Hsion
    Ngan, Sue Lin
    How, Bing Shen
    Ng, Wendy Pei Qin
    Lam, Hon Loong
    JOURNAL OF CLEANER PRODUCTION, 2022, 379
  • [50] Life cycle assessment of the European pressurized reactor and the influence of different fuel cycle strategies
    Simons, A.
    Bauer, C.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 2012, 226 (A3) : 427 - 444