Comprehensive assessment on the life-cycle environment impact of railway construction projects

被引:0
|
作者
Wu Wenjie [1 ]
Wang Zhonghao [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
关键词
Railway project; Environment impact assessment; Life cycle assessment (LCA); Quantitative assessment; Analytic hierarchy process (AHP);
D O I
10.4028/www.scientific.net/AMM.361-363.1467
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There is a huge impact of railway projects on the regional environment. A life cycle assessment (LCA) framework using quantitative methodwas developed to evaluate the environment impact of railway projects quantitatively. The railway life cycle was divided into 5 phases: survey and design, raw materials processing, construction, operation, and demolition. The life cycle environmental impact for railway project was categorized into 5 grades: great negative influence, little negative influence, no influence, little positive influence, and great positive influence. Based on the improved AHP method, a quantitative method was introduced to evaluate comprehensive environmental impact of railway projects. A railway project was analyzed as a case study. The results show that the major environment impact is occurred during the phases of operation and demolition. It is demonstrated that the method is applicable to assess the life-cycle environmental impact of railway projects. In recent years, China's railway projects construction has made great achievement and promoted the economic and social development. In the meantime, due to its large work quantity and long construction period, the railway projects have a major environmental impact([1,2]). Nowadays, the life cycle environmental assessment of railway projects in China is still under research. Therefore, it is necessary to develop the corresponding evaluation methods and theories on the life cycle environmental assessment of railway projects by establishing index system. In this paper, a life cycle assessment (LCA) framework using quantitative method was developed to evaluate the environment impact of railway projects quantitatively. The railway life cycle was divided into 5 phases: survey and design, raw materials processing, construction, operation, and demolition.
引用
收藏
页码:1467 / 1471
页数:5
相关论文
共 50 条
  • [1] LIFE-CYCLE COSTING FOR CONSTRUCTION PROJECTS
    WUBBENHORST, KL
    [J]. LONG RANGE PLANNING, 1986, 19 (04) : 87 - 97
  • [2] Life Cycle Assessment of Construction and Demolition Waste from Railway Engineering Projects
    Huang, Jianling
    Yin, Yang
    Zheng, Lei
    Zhang, Sibo
    Zhao, Qingyun
    Chen, Huihua
    [J]. COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [3] Comprehensive Infrastructure Life-Cycle Assessment
    Strauss, A.
    Grossberger, H.
    Bergmeister, K.
    Zimmermann, T.
    Ralbovsky, M.
    Alten, K.
    Lachinger, S.
    Petschacher, M.
    [J]. LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 200 - 207
  • [4] Life-cycle assessment tool for railway infrastructure
    Castlo, D.
    Linneberg, P.
    Puddicombe, R.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1064 - 1068
  • [5] Life cycle assessment for the "implicit" environmental impact of construction projects
    Xiao-gen Shuai1
    2. Hubei Key Laboratory of Control Structure
    3. Bartlett School of Graduate Study
    [J]. Journal of Pharmaceutical Analysis, 2009, 21 (03) : 167 - 171
  • [6] Design of railway bridges considering life-cycle assessment
    Thiebault, Vincent
    Du, Guangli
    Karoumi, Raid
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2013, 166 (04) : 240 - 251
  • [7] Environmental life-cycle assessment of railway track beds
    Kiani, M.
    Parry, T.
    Ceney, H.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2008, 161 (02) : 135 - 142
  • [8] Comprehensive Life-cycle Assessment of SIP Building
    Du, Qiang
    Zhang, Huanfang
    Liu, Nan
    Yin, Xusheng
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 2808 - +
  • [9] Life-Cycle Assessment for Construction of Sustainable Infrastructure
    Parrish, Kristen
    Chester, Mikhail
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2014, 19 (01) : 89 - 94
  • [10] Application Research of BIM in Environment Assessment of Full Life Cycle for Construction Projects
    Wang Huali
    [J]. 2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 652 - 655