Geological and geotechnical evaluation of the tunnel site of the Koto Hydropower Project, Khyber Pakhtunkhwa, Pakistan

被引:2
|
作者
Khan, Nasar [1 ]
Siddiqui, Muhammad Ejaz [2 ]
Ullah, Naveed [1 ]
Awais, Muhammad [3 ]
Khurshid, Salman [1 ]
机构
[1] Univ Malakand, Dept Geol, Chakdara 18800, Pakistan
[2] Sarwar & Co Pvt Ltd, Islamabad 45510, Pakistan
[3] Univ Swabi, Dept Geol, Anbar 23561, Pakistan
关键词
HIMALAYAN REGION; SELECTION; DAM;
D O I
10.1144/qjegh2021-155
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Hydropower projects provide excellent opportunities to cope with rising energy demands; however, their geological and geotechnical evaluation is fundamental to ensure their long-term performance and stability. Thus, geological and geotechnical investigations were carried out to evaluate the feasibility of a tunnel (7 m diameter and 1880 m length) for the Koto Hydropower Project, Khyber Pakhtunkhwa, Pakistan. Five investigation boreholes with a cumulative depth of 145 mwere drilled and samples were collected for qualitative observation and laboratory analyses. The geotechnical investigations include Lugeon and permeability tests to estimate the hydraulic conductivity of the associated rocks. In the boreholes, lithologies and discontinuities such as joints, fractures, veins and shear zones were identified. Lithological logging, rock quality designation and percentage core recovery were used to understand rock behaviour and strength. The rocks encountered are mainly gabbronorites and granodiorites with some amphibolites. The bedrock strength is designated as R4 (strong) with a minor amount of R3 (moderate), indicating suitability and feasibility for tunnel construction. The Main Mantle Thrust is the major tectonic feature, which is located towards the southern side of the study area; however, seismicity along it is not significant. The geological and geotechnical investigation indicated the suitability of the tunnel site for construction.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] Evaluation of environmental impact assessment and mitigation strategies for Gulpur hydropower project, Kotli, Pakistan
    Butt, Asim Qayyum
    Shangguan, Donghui
    Ding, Yongjian
    Banerjee, Abhishek
    Mukhtar, Muhammad Ahsan
    Taj, Khurram
    DISCOVER APPLIED SCIENCES, 2024, 6 (04)
  • [42] Evaluation of environmental impact assessment and mitigation strategies for Gulpur hydropower project, Kotli, Pakistan
    Asim Qayyum Butt
    Donghui Shangguan
    Yongjian Ding
    Abhishek Banerjee
    Muhammad Ahsan Mukhtar
    Khurram Taj
    Discover Applied Sciences, 6
  • [43] Evaluation of Non-Structural Protein-1(NS1) positive patients of 2013 dengue outbreak in Khyber Pakhtunkhwa, Pakistan
    Lutfullah, Ghosia
    Ahmed, Jawad
    Khan, Aftab
    Ihsan, Hina
    Ahmad, Jamshed
    PAKISTAN JOURNAL OF MEDICAL SCIENCES, 2017, 33 (01) : 172 - 176
  • [44] Static and Dynamic Influence of the Shear Zone on Rockburst Occurrence in the Headrace Tunnel of the Neelum Jhelum Hydropower Project, Pakistan
    Naji, Abdul Muntaqim
    Rehman, Hafeezur
    Emad, Muhammad Zaka
    Ahmad, Saeed
    Kim, Jung-joo
    Yoo, Hankyu
    ENERGIES, 2019, 12 (11)
  • [45] Engineering geological and geotechnical investigations along the head race tunnel in Teesta Stage-III hydroelectric project, India
    Panda, Malaya K.
    Mohanty, S.
    Pingua, B. M. P.
    Mishra, A. K.
    ENGINEERING GEOLOGY, 2014, 181 : 297 - 308
  • [46] Geological and geotechnical evaluation of limestone rocks along the Riyadh Metro Project (Riyadh City, Saudi Arabia)
    Almajed A.
    Aldhowian A.
    Abdelrahman K.
    Arabian Journal of Geosciences, 2021, 14 (2)
  • [47] Squeezing Assessment Along 2.84-km-Long Headrace Tunnel of a Small Hydropower Project in KPK, Pakistan: Comparison of Different Methods
    Akram, Mian Sohail
    Noor, Aisha
    Ullah, Muhammad Fahad
    Ahmed, Luqman
    Rehman, Faisal
    Ali, Muhammad
    INTERNATIONAL JOURNAL OF GEOSYNTHETICS AND GROUND ENGINEERING, 2019, 5 (03)
  • [48] Finite Difference Analysis of Empirical Tunnel Support Design in High Stress Fractured Rock Mass Environment at Bunji Hydropower Project, Pakistan
    Rehman, Hafeezur
    Ali, Wahid
    Shah, Kausar Sultan
    Hashim, Mohd Hazizan Bin Mohd
    Khan, Naseer Muhammad
    Ali, Muhammad
    Kamran, Muhammad
    Junaid, Muhammad
    JOURNAL OF MINING AND ENVIRONMENT, 2022, 13 (03): : 781 - 795
  • [49] Squeezing Assessment Along 2.84-km-Long Headrace Tunnel of a Small Hydropower Project in KPK, Pakistan: Comparison of Different Methods
    Mian Sohail Akram
    Aisha Noor
    Muhammad Fahad Ullah
    Luqman Ahmed
    Faisal Rehman
    Muhammad Ali
    International Journal of Geosynthetics and Ground Engineering, 2019, 5
  • [50] Experiences Learned from Engineering Geological Investigation of Headrace Tunnel on Sedimentary Rock-Xekaman3 Hydropower Project-Lao PDR
    Nguyen Song Thanh
    Dao Dang Minh
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 6: APPLIED GEOLOGY FOR MAJOR ENGINEERING PROJECTS, 2015, : 377 - 380