Evaluation of environmental impact assessment and mitigation strategies for Gulpur hydropower project, Kotli, Pakistan

被引:1
|
作者
Butt, Asim Qayyum [1 ,2 ,3 ]
Shangguan, Donghui [1 ,2 ,3 ]
Ding, Yongjian [1 ,2 ,3 ]
Banerjee, Abhishek [1 ]
Mukhtar, Muhammad Ahsan [1 ,2 ,3 ]
Taj, Khurram [4 ]
机构
[1] Chinese Acad Sci, Northwest Inst Ecoenvironm & Resources, State Key Lab Cryospher Sci, Lanzhou 730000, Peoples R China
[2] Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[3] China Pakistan Joint Res Ctr Earth Sci, CAS HEC, Islamabad 45320, Pakistan
[4] Natl Univ Sci & Technol, NUST Inst Civil Engn, Islamabad 45320, Pakistan
关键词
Sustainable development goals; Environmental impact assessment; Hydropower; Environmental protection agency; Potential effects; QUALITY;
D O I
10.1007/s42452-024-05786-5
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Environmental Impact Assessment (EIA) became mandatory in Pakistan in 1983 with the passage of the Pakistan Environmental Protection Ordinance. The Sustainable Development Goals were incorporated into Pakistan's national development strategy, making it the first country in history to do so. The study is based on evaluating the mitigation strategies and environmental impact assessment at the Gulpur Hydropower Project (HPP), Kotli, AJK, which uses the Poonch River's water resources to generate power and has a design capacity of 100 MW using the EIA documentation of Gulpur HPP. In addition to making additional observations and reviewing the literature, the study looked at Mira Power Limited's EIA reports. The possible effects, as well as the Government's and MPL's mitigating actions, were examined by the authors. EIA procedures at the Gulpur HPP considered several laws, including the Pakistan Environmental Protection Agency, AJK Wildlife Ordinance of 2013, the Land Acquisition Act of 1894, and Laws Regulating Flow Releases for Hydropower Projects. Projects using hydropower in delicate areas carry a high risk. Given the thorough analysis of the hazards in this instance, it is evident that the EIA had a significant impact on the project's design. The authors concluded that there are no negative environmental effects of the construction of hydropower projects in the concerned area and that all potential effects and compensation were handled legally and efficiently. The study suggested that all hydropower projects in Pakistan undertake environmental impact assessments. Evaluating the mitigation strategies and environmental impact assessment at the Gulpur Hydropower Project.EIA procedures at the Gulpur HPP considered several laws, including the Pakistan Environmental Protection Agency.The development of hydropower projects in the affected area had no negative environmental effects, and any potential effects or compensation were handled lawfully and effectively.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Evaluation of environmental impact assessment and mitigation strategies for Gulpur hydropower project, Kotli, Pakistan
    Asim Qayyum Butt
    Donghui Shangguan
    Yongjian Ding
    Abhishek Banerjee
    Muhammad Ahsan Mukhtar
    Khurram Taj
    Discover Applied Sciences, 6
  • [2] Evaluation and improvement of the environmental impact mitigation plan of a hydropower project in Thailand
    Tingsanchali, Tawatchai
    Watanabe, Tsunemi
    Chinshed, Kitti
    WATER INTERNATIONAL, 2008, 33 (04) : 505 - 516
  • [3] Assessing the existing guidelines of environmental impact assessment and mitigation measures for future hydropower projects in Pakistan
    Butt, Asim Qayyum
    Shangguan, Donghui
    Ding, Yongjian
    Banerjee, Abhishek
    Sajjad, Wasim
    Mukhtar, Muhammad Ahsan
    FRONTIERS IN ENVIRONMENTAL SCIENCE, 2024, 11
  • [4] Achieving an environmentally sustainable outcome for the Gulpur hydropower project in the Poonch River Mahaseer National Park, Pakistan
    Cate Brown
    Vaqar Zakaria
    Alison Joubert
    Muhammad Rafique
    Jahanzeb Murad
    Jackie King
    Jessica Hughes
    Pablo Cardinale
    Leeanne Alonzo
    Sustainable Water Resources Management, 2019, 5 : 611 - 628
  • [5] Achieving an environmentally sustainable outcome for the Gulpur hydropower project in the Poonch River Mahaseer National Park, Pakistan
    Brown, Cate
    Zakaria, Vaqar
    Joubert, Alison
    Rafique, Muhammad
    Murad, Jahanzeb
    King, Jackie
    Hughes, Jessica
    Cardinale, Pablo
    Alonzo, Leeanne
    SUSTAINABLE WATER RESOURCES MANAGEMENT, 2019, 5 (02) : 611 - 628
  • [6] Evaluation of environmental impact assessment system in Pakistan
    Nadeem, Obaidullah
    Hameed, Rizwan
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2008, 28 (08) : 562 - 571
  • [7] Evaluation of Environmental Impact Assessment legislation in Pakistan
    Khan, Mehreen
    Chaudhry, M. N.
    IMPACT ASSESSMENT AND PROJECT APPRAISAL, 2024, 42 (02) : 123 - 140
  • [8] Climate change impact assessment, flood management, and mitigation strategies in Pakistan for sustainable future
    Imran Khan
    Hongdou Lei
    Ashfaq Ahmad Shah
    Inayat Khan
    Ihsan Muhammad
    Environmental Science and Pollution Research, 2021, 28 : 29720 - 29731
  • [9] Climate change impact assessment, flood management, and mitigation strategies in Pakistan for sustainable future
    Khan, Imran
    Lei, Hongdou
    Shah, Ashfaq Ahmad
    Khan, Inayat
    Muhammad, Ihsan
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (23) : 29720 - 29731
  • [10] Mainstreaming Flora Conservation Strategies into the Mitigation Hierarchy to Strengthen Environmental Impact Assessment
    Taís Nogueira Fernandes
    Fernando Marino Gomes dos Santos
    Flávio Dayrell Gontijo
    João Alves da Silva Filho
    Alexandre Franco Castilho
    Luis Enrique Sánchez
    Environmental Management, 2023, 71 : 483 - 493