Optimal pricing and financing strategies for leased equipment considering maintenance and lessees' options

被引:4
|
作者
Liu, Yanping [1 ]
Liu, Biyu [1 ,2 ]
Yang, Haidong [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou, Peoples R China
[2] Fuzhou Univ, Logist Res Ctr, Fujian Social Sci Res Base, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Pricing and financing; Lessees' options; Leasing; Preventive maintenance; Game-theoretic; CONSTRAINED SUPPLY CHAIN; POLICIES; NEWSVENDOR; MODELS; BANK;
D O I
10.1016/j.ijpe.2024.109157
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Periodic payment for leased equipment may lead to capital constraint for lessors. In view of preventive maintenance (PM) strategy and lessees' options, the impact of different financing modes on lessor's pricing decisionmaking for leased equipment is studied. By considering the impact of age and usage on PM strategy and lessees' revenue, and lessees -different options to return, renew or purchase leased equipment after the lease expires, a game -theoretic model with respect to advance payment, bank loan and mixed financing modes is presented. The lessor's optimal pricing and financing strategies, as well as lessees' options are obtained by using noncooperative game, cooperative game and transfer -payment contract. The results show: (1) with the increase of bargaining level, the periodic rental price decreases; Under non -cooperative game, lessees renew the equipment first and then purchase it, while under cooperative game lessees always renew the lease. The lessor can motivate lessees to participate in cooperation through appropriate transfer -payment contract; (2) as the advance payment discount increases, the lessor shifts from advance payment to bank loan financing mode under non -cooperative game, while always adopts a financing mode including advance payment under cooperative game. Both leasing parties accept the advance payment financing mode only when the advance payment discount is within a certain range; (3) the increased usage of leased equipment brings larger PM and corrective maintenance (CM) burden to the lessor, which affects lessees' options and both leasing parties' profits. The lessor shall measure the PM and CM costs of leased equipment to maximize the profit.
引用
收藏
页数:14
相关论文
共 46 条
  • [41] Optimal Pricing and Green Product Design Strategies in a Sustainable Supply Chain Considering Government Subsidy and Different Channel Power Structures
    Xue, Kelei
    Sun, Guohua
    Wang, Yuyan
    Niu, Shuiye
    SUSTAINABILITY, 2021, 13 (22)
  • [42] Pricing and green promotion effort strategies in dual-channel green supply chain: considering e-commerce platform financing and free-riding
    Li, Mengwan
    Shan, Miyuan
    JOURNAL OF BUSINESS & INDUSTRIAL MARKETING, 2023, 38 (11) : 2310 - 2323
  • [43] Day-ahead optimal bidding and scheduling strategies for DER aggregator considering responsive uncertainty under real-time pricing
    Wang, Fei
    Ge, Xinxin
    Yang, Peng
    Li, Kangping
    Mi, Zengqiang
    Siano, Pierluigi
    Duic, Neven
    ENERGY, 2020, 213
  • [44] Optimal condition-based maintenance policy considering nested conditional value-at-risk and operational availability: A case study on semiconductor manufacturing equipment
    An, Donghyun
    Lee, Deok-Joo
    IISE TRANSACTIONS, 2024,
  • [45] Optimal two-period pricing decisions and value-added service strategies of two-sided platform considering suppliers entry timing
    Zeng, Huabao
    Shu, Tong
    Yu, Yue
    Cheng, Jiaming
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (05) : 3341 - 3370
  • [46] Optimal pricing strategies of e-commerce supply chain considering consumers' anticipated regrets under the background of blockchain anti-counterfeiting technology
    Yu, Tianyang
    Guan, Zhimin
    Li, Jin
    Zhang, Jun
    Dong, Jingyang
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (06) : 4128 - 4173